1 Indonesia Green Infrastructure Summit
- Toshiba’s Energy Solution for Indonesia - Contributing to energy infrastructure through thermal power and renewables TOSHIBA Corporation Corporate Vice President and Corporate Representative-Asia Fumio Otani

2 Overview of Indonesia Electricity
To Catch-up the Vigorous Demand Growth, development of Power Supply Resource is an Urgent Issue -Population growth -Economic growth -Construction growth -Increased welfare -Change of lifestyle

3 What is required to increase 35GW Capacity?
25 President Joko Widodo Established the aggressive power supply development plan to add 35GW during next five years. 20 15 10 5 60.2% To achieve the plan, Coal Fired power plant is expected to exceed half of total demand for following reasons; - Rich coal resource in Indonesia - Oil exported to foreign country - Rapid necessity to increase capacity

4 Efficiency Comparison between countries
Efficiency Comparison between countries for Coal Fire Thermal Power Generation India (664TW) China (3345TW) The U.S (1921TW) Japan (281TW) Germany (268TW) Korea (218TW) Russia (164TW) EU (27 countries) (584TW) World Total (8657TW) Efficiency (%)

5 Technology Trend in Indonesia and Toshiba’s Track record
1999 Project – B USC 1000MW×2           2016 Banjarmasin sub-critical 65MW×2          Tanjung Jati B.Ex sub-critical 660MW×2           For future projects, USC(*) Power Plants are expected Up to now, Sub-critical Power Plants has been dominant Project – A USC 1000MW×1          2015 1981 1994 2006 Gresik sub-critical ・100MW×2 ・200MW×2 Paiton sub-critical ・400MW×2                Tanjung Jati B sub-critical 660MW×2                *Note USC: Ultra Super Critical           

6 Coal Fired Power Plant Efficiency and CO2 Emission
CO2 Emission in each 1000MW Plant Type USC Technology contributes to reduce CO2 Emission - 963,741 ton / year, compared to Subcritical Power. ▲17% ▲28%

7 Toshiba’s Energy Solutions
Indonesia Energy Trend Toshiba Solutions Shifting Main Source from Oil to Coal Coal Fired Power Plants Needed as Base Load energy USC Coal-fired Power Plant High Efficiency 2) Less CO2 and Emission GTCC Advanced C/C Plant with No.1 Efficiency Retrofit Solutions Life Extension & Performance Recovery Geothermal Plants Wide Range 2MW-200MW Hydro Power Plants 1kW-800MW Line-up Gas for Peak Load Increase of Aged-plants Accelerating to utilize Renewable Energy Development of Geothermal Hydro Power *Note GTCC: Gas Turbine Combined Cycle           

8 Toshiba’s Energy Solutions Line Up
Hydro Geothermal Wind CCS (CO2 capture) Mega solar Smart grid Thermal Nuclear T&D

9 Footprints in Indonesia
Thermal :12Units (4,170MW) Hydro :33Units (1,490MW) Geothermal :5Units (290MW) including on-going plants Siguragura 73MWx4 Sarulla 60MWx3(on-going) Lumut Balai 55MWx1 (on-going) Gresik 100MWx2 200MWx2 Bakaru 66MWx2 Saguling 179MWx4 Tanjung Jati B 660MWx4 Bili Bili 14MW & 6MW Paiton 400MWx2 Sipansihaporas 34MW & 17MW Maninjau 18MWx4 Batutegi 15MWx2 Patuha 55MWx1 Wonorejo 7MW Lodoyo 5MW Wlingi 28MWx2 Sutami 36MWx3 Kukusan 26kW

10 Toshiba will contribute by Clean Energy Solutions to realize
Indonesia’s Green Infrastructure Development.