Presentation is loading. Please wait.

Presentation is loading. Please wait.

Mounting arrangement for the Solid Absorber. This contains mounting arrangement for:- 1. Handling and lifting from manufacturer’s place to RAL; 2. For.

Similar presentations


Presentation on theme: "Mounting arrangement for the Solid Absorber. This contains mounting arrangement for:- 1. Handling and lifting from manufacturer’s place to RAL; 2. For."— Presentation transcript:

1 Mounting arrangement for the Solid Absorber. This contains mounting arrangement for:- 1. Handling and lifting from manufacturer’s place to RAL; 2. For hanging the solid absorber inside the spool piece; 3. For mounting the solid absorber inside the AFC.

2 Clamping arrangement for general handling and Lifting from Works to RAL

3 Once at RAL, the hanging frame (made of 2mm thick sheet plate) replaces the eye bolt and allows the solid absorber to be mounted underside of the Spool piece access hole cover plate 520 mm Max width 70mm

4 Mounting tube to secure Solid Absorber sub-assembly to the AFC Large End Flange (at the safety window mounting bolt holes)


Download ppt "Mounting arrangement for the Solid Absorber. This contains mounting arrangement for:- 1. Handling and lifting from manufacturer’s place to RAL; 2. For."

Similar presentations


Ads by Google