Presentation is loading. Please wait.

Presentation is loading. Please wait.

mySAP Aerospace & Defense Developments for Enterprise Release

Similar presentations


Presentation on theme: "mySAP Aerospace & Defense Developments for Enterprise Release"— Presentation transcript:

1 mySAP Aerospace & Defense Developments for Enterprise Release
HaJo Lockermann IBU Aerospace & Defense

2 mySAP Aerospace & Defense 4.7
Enterprise Release for mySAP A&D Overview and Release Schedule Maintenance & Service Planning Key Process Steps and Demo Line Maintenance Key Process Steps and Demo

3 mySAP Aerospace & Defense 4.7
Enterprise Release for mySAP A&D Overview and Release Schedule Maintenance & Service Planning Key Process Steps and Demo Line Maintenance Key Process Steps and Demo

4 New Functionality in DIMP 4.71 and APO 4.0 for A&D
Line Maintenance Solution Aircraft Logbook for Flight Data and Defect Recording Easy to use Solution for Defect Rectification integrated in the Aircraft Logbook Integrated Component Exchange Enhancements of Maintenance Event Builder for planning of deferred defects Maintenance & Service Planning Solution for Scheduling and Planning of Aircraft Checks in APO 4.0 Integration of Slot Plan to R/3 Enhancements of Maintenance Event Builder for Heavy Maintenance, esp. new Planning Board

5 DIMP 471 APO 4.0 Release Schedule
Release to Customer on for DIMP 4.71 and APO 4.0 DIMP 471 Development Test Solution Validation Ramp-Up 29.11. 28. 2. 23.06 30.06 01 02 03 04 05 06 07 08 10 09 11 12 01 02 03 04 05 06 07 08 10 09 11 12 2002 2003 APO Development 29.11. Test Solution Validation Ramp-Up 28. 2. 23.06 30.06 APO 4.0

6 mySAP Aerospace & Defense 4.7
Enterprise Release for mySAP A&D Overview and Release Schedule Maintenance & Service Planning Key Process Steps and Demo Line Maintenance Key Process Steps and Demo

7 Planning Horizons Strategic planning - 10 years - 18 months - 3 months
Today Strategic planning Capacity and long term check schedule (Frequency task-dependent) Maintenance facilities/resources Tactical planning Optimize schedule for checks based on given resources (Daily/Weekly) Maintenance schedule (Aircraft/check type / location/timeframe) Operational planning Creation of work orders work packaging detailed scheduling (Daily) Work packages orders/task cards Execution Order execution & confirmation (Daily)

8 Strategic Planning Objectives - A Selection ….
Long-term forecasting of maintenance demands for aircrafts and components Long-term evaluation of required resources to maintain own fleet or to perform customer service Identification of bottleneck situations Hangar capcities Mechanics (grouped by skills) Identification of unused capacity available for acquiring new business Perform what-if analysis Strategic Planning

9 Tactical Planning Objectives – A Selection …
Monitor aircraft / component compliance based current aircraft utilization Generation of slot plan based on maintenance demands for individual aircrafts Build work packages to perform component overhaul in parallel with aircraft checks Balance workload for own resources by changing slots or splitting tasks Balance workload with agreed supplier capacity Maximize aircraft utilization and maintenance resource load Tactical Planning

10 Examples of Daily Planning Tasks
Higher than expected aircraft utilization results in earlier compliance date Aircraft was re-routed to another terminating location, requiring the maintenance execution to take part at another location Technical problems require grounding of aircraft for a couple of days, delaying the planned maintenance New unplanned work (e.g. due to modification required by AD) must be integrated into current plan Customer asks for additional service for one of its aircraft ...

11 Overview Long Term Planning
Resources Component Repair Shops Aircraft Life-cycle controlled components Long Term Slot & Capacity Planning (Strategic view) Maint. Forecast Capacity demand ~10 years APO Internal + 3rd party Hangars Mechanics Counters Slot Plan Line 2 Line 1 Line 3 Service Check Scheduling (Tactical view) Capacity Maint. Slot ~ 18 month Maint. Demand APO Tools Maintenance Cycles Spare Parts Task Lists Detailed Work Packaging & Sequencing ~3 month R/3

12 Added Business Value Identify unused resource capacities in your maintenance operations which can be used to acquire new business Allows you to identify bottleneck situations early in advance, before they disrupt your maintenance execution Improves availability of your fleet assets by reducing aircraft release to service delays due to resource shortages Increases utilization of your maintenance resources (hangar space, mechanics) by helping you to balance the workload Offers you simulation features to evaluate different what-if scenarios in order to resolve resource shortages and to support you in strategic business decisions

13 Counter Values for Aircraft

14 Maintenance Plan for Aircraft

15 Copying of Planning Version – Master Data only

16 Maintenance Profile Details

17 MSP Planning Board - Object List

18 Checks stored in APO for Aircraft

19 MSP Planning Board - Slots Overview
Slot for A Check of A330 shown in list Also shown in Chart for Service Areas and Aircraft

20 MSP Planning Board – Demand Details

21 MSP Planning Board – Demand Details

22 mySAP Aerospace & Defense 4.7
Enterprise Release for mySAP A&D Overview and Release Schedule Maintenance & Service Planning Key Process Steps and Demo Line Maintenance Key Process Steps and Demo

23 Characteristics of Line Maintenance
Aircraft is in service and committed to revenue schedule Gate maintenance / ramp checks (before departure) Limited time (approx min.) Visual inspection, Aircraft log is viewed and cleared Turnaround / overnight maintenance (at terminating locations) Work is more predictable Daily checks, aircraft log, correction of deferrals, minor scheduled checks, sometimes also modifications Primary business drivers Safety On-time dispatch of aircraft Scope depends on company!

24 Added Business Value Real-time capturing of defects B shorter turnaround ASAP analysis and deferral of defects Prepares for efficient repair (Labor and Material) Accurate defect overview for Flight Ops, Production planners and Execution planners Line Maintenance planning B shorter turnaround Creating robust production plan using resource availability and flight schedules Real-time configuration checks and updates B safety & regulatory compliance Integration with supply chain management and component maintenance B shorter turnaround & lower procurement costs Collecting Line Maintenance costs including labor and materials B enabling third party maintenance or collecting internal costs

25 Line Maintenance Process
Slots Target slot Previous flight Flights Flight data capturing Business Processes Defect capturing Deferral Deferral Deferral New defects Work arising Production Planning Execution Planning Execution Certification Defect Analysis time ~ - 7 days ~ days

26 Flight Data Capturing / Defect Capturing
Role: Mechanic / Pilot / Crew Activities: Record aircraft flight data Detection of aircraft/component defect Entry of defects affecting aircraft airworthiness into aircraft logbook Objectives: Early as possible alert of defect Materials / labor / etc Classify defect to enable later analysis identify impact of operations Location: Line station Aircraft Logbook Mechanic PM/CS Notifications Counters Measurement documents

27 Logbook Defect Analysis Role: Activities: Objectives: Location:
Engineer Mechanic Activities: Monitor raised defects Monitor aircraft performance Search for fix/solution Assign solution Defer defect Objectives: Serviceable aircraft Enable planning of deferred defects Meet flight schedule Location: Central engineering department Line station Logbook Engineer PM/CS Notification Classification for Functional Locations Maintenance History Solution Database Mechanic

28 MEB Production Planning Role: Activities: Objectives: Location:
Production planner Activities: Select outstanding work: Deferred defects Scheduled maintenance etc Select ground time slot Package work Check feasability Objectives: Minimize number of deferrals (fix defects as fast as possible) Maximize utilization of resources Achieve TDR targets (95%) Minimize preventive maintenance (as late as possible) within certain risk Location: Central maintenance control MEB PM/CS Notification Maintenance Event Builder Revision (Work package) Task List PM/CS Order Planner

29 MEB Execution Planning Role: Activities: Objectives: Location:
Shift manager Activities: Review preplanned word Defer defect Adjust work packages Assign resources Objectives: Prepare for efficient execution Mechanics Parts Tools Location: Line station MEB Shift Manager PM/CS Order Components Work Center / Technician assignment Integration into Supply Chain Management

30 Logbook Execution Role: Activities: Objectives: Location:
Mechanic Activities: Review planned work Defect capture Defer defect Perform work Record work performed (incl. component changes) Objectives: Productive repair Adhere to quality standards Location: Line station Logbook Mechanic PM/CS Notification PM/CS Order Master Parts List Enhanced Component Installation / Removal Completion Confirmation

31 Logbook Certification Role: Activities: Objectives: Location:
Inspector Activities: Review task completion Perform quality checks Certify airworthiness / release aircraft to service Objectives: Meet regulatory requirements Location: Line station Logbook Inspector Configuration Control Workbench Digital Signature Closing of Notification Order Revision

32 Logbook Coverage Slots Target slot Flights Flight data capturing
Previous flight Flights Flight data capturing Business Processes Defect capturing Deferral Deferral Deferral New defects Work arising Production Planning Execution Planning Execution Certification Defect Analysis time ~ - 7 days ~ days

33 Maintenance Event Builder Coverage
Slots Target slot Previous flight Flights Flight data capturing Business Processes Defect capturing Deferral Deferral Deferral New defects Work arising Production Planning Execution Planning Execution Certification Defect Analysis time ~ - 7 days ~ days

34 Flight Data Capturing in Aircraft Logbook
Flight Data Capturing creates Flight Log entry in A/C Logbook Measurement Documents for A/C counters (Hours/Cycles)

35 Fast Data Capture for Defect and Rectification
Simplest Case: Fast Data Capturing for Defect Actions Taken (Operation) Exchanged Components

36 Defect Capturing creates Logbook Notification
Description of Defect Affected Objects Classification of Defect (Damage Codes) Planning Data

37 Specify Operations to Rectify Defect
Assignment of Task Lists or manual creation of operations Deferral Description via Long Text Time Recording Certification with Digital Signature

38 Component Availability & Configuration Exchange
List of Required Spart Parts preplanned via reservations manual entry for unplanned demands Integrated Availability Check Component Exchange Removal Installation Swap Fully integrated with configuration check Full IE4N functionality in background

39 Deferral of Defects Deferral
Date based Performance based Deferred Defects are input for Maintenance Planning in MEB

40 Production Planning in Enhanced MEB
Multiple Revisions Drag & Drop Powerful Filter Options Graphical Planning Board with different views

41 Flight History in Aircraft Logbook

42 Logbook as Maintenance Execution Workbench (1)
Maintenance execution features Generic work selection via operations

43 Logbook as Maintenance Execution Workbench (2)
External notifications included Maintenance execution features Includes preventive maintenance work (e.g. generated by MEB) All context information for operations within one screen (A/C, notification, flight) All execution functions available (confirm, component exchange, etc.)

44 Thank you for your attention!

45 Copyright 2003 SAP AG. All Rights Reserved
No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice. Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors. Microsoft®, WINDOWS®, NT®, EXCEL®, Word®, PowerPoint® and SQL Server® are registered trademarks of Microsoft Corporation. IBM®, DB2®, DB2 Universal Database, OS/2®, Parallel Sysplex®, MVS/ESA, AIX®, S/390®, AS/400®, OS/390®, OS/400®, iSeries, pSeries, xSeries, zSeries, z/OS, AFP, Intelligent Miner, WebSphere®, Netfinity®, Tivoli®, Informix and Informix® Dynamic ServerTM are trademarks of IBM Corporation in USA and/or other countries. ORACLE® is a registered trademark of ORACLE Corporation. UNIX®, X/Open®, OSF/1®, and Motif® are registered trademarks of the Open Group. Citrix®, the Citrix logo, ICA®, Program Neighborhood®, MetaFrame®, WinFrame®, VideoFrame®, MultiWin® and other Citrix product names referenced herein are trademarks of Citrix Systems, Inc. HTML, DHTML, XML, XHTML are trademarks or registered trademarks of W3C®, World Wide Web Consortium, Massachusetts Institute of Technology. JAVA® is a registered trademark of Sun Microsystems, Inc. JAVASCRIPT® is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape. MarketSet and Enterprise Buyer are jointly owned trademarks of SAP AG and Commerce One. SAP, SAP Logo, R/2, R/3, mySAP, mySAP.com and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and in several other countries all over the world. All other product and service names mentioned are trademarks of their respective companies.


Download ppt "mySAP Aerospace & Defense Developments for Enterprise Release"

Similar presentations


Ads by Google