Presentation is loading. Please wait.

Presentation is loading. Please wait.

Erika Hutko | June 2014 U.S. Department of Education Software Vendors Webinar CPS Update for Software Vendors.

Similar presentations


Presentation on theme: "Erika Hutko | June 2014 U.S. Department of Education Software Vendors Webinar CPS Update for Software Vendors."— Presentation transcript:

1 Erika Hutko | June 2014 U.S. Department of Education Software Vendors Webinar CPS Update for Software Vendors

2 The CPS Update will provide ‘heads up’ information for programmers and data processing staff about the 2015-2016 changes to the Institutional Student Information Record (ISIR) layout and the CPS enhancements. Presenter: Erika Hutko

3 3 Central Processing System (CPS) Changes Institutional Student Information Record (ISIR) Changes CPS Test System Important Dates

4 2015-2016 CPS Changes 4

5 2015-2016 CPS Enhancements NSLDS Data Changes - Subsidized Loan Eligibility Used field (SLEU) will be renamed to Subsidized Usage Period - Confirmed Loan Subsidy Status added - Subsidy Status Date added - New value of R added for Loan Limit Flags - New SAR Comments - New Program code for Direct Perkins Loan - ACG and SMART Grant data deleted - New and redefined Post screening codes New Foster Care SAR Comments - FOTW Foster Care screening question will be added (seen in FOTW only) - New SAR Comments 5

6 Subsidized Loan Eligibility Used (SLEU) Renamed The Subsidized Loan Eligibility Used field will be renamed to Subsidized Usage Period 6

7 Confirmed Loan Subsidy Status Confirmed Loan Subsidy Status Valid Values L = Lost Subsidy R = Reinstated Subsidy N = Not applicable for non-D0 loans or No change to subsidy status for D0 loans 7

8 8 Subsidy Status Date Valid Values Date (Numeric) N/A Subsidy Status Date

9 New value of R and new SAR Comments A value of R will be added to the current loan limit flags. R will be defined as ‘Exceeded loan limit and reaffirmed debt’. A SAR comment will be added for a value of R in the Undergraduate Subsidized or Combined Loan Limit Flags. A SAR comment will be added for a value of R in the Graduate Subsidized or Combined Loan Limit Flags. The SAR C flag will be set by the new comments. 9

10 10 *A new Program code for Direct Perkins Loan will be added New Program Code

11 11 ACG and SMART Grant (detailed payment and aid overpayment) data will be deleted. ACG and SMART Grant

12 12 Post screening Reason Code 26 will be added for a change in Confirmed Loan Subsidy Status. Post screening Reason Code 27 will be added for decreases in the Subsidized Usage Period. Post screening New Reason Codes

13 13 Post screening reason codes 11 and 12 will be redefined as follows: 11= Exceeding Subsidized loan limit resolved 12 = Exceeding Combined loan limit resolved Post screening reason code 13 will be redefined as “Not in use” Post screening Redefined Reason Codes

14 New Foster Care Comments and Screening Question Two new SAR comments regarding eligibility for Foster Care programs New FOTW Foster Care screening question added 14

15 New Foster Care Comments A SAR comment will be added for non-FOTW filers who respond Yes to the current Orphan/Foster Care/Ward of the Court dependency question; the comment text will include a URL for additional information. A SAR comment will be added for FOTW filers who respond Yes to the Foster Care screening question; the comment text will include a URL for additional information. 15

16 16 CPS Test System

17 2015-2016 CPS Test System Draft Application Processing Software Developers Specifications slated to be posted mid August Updates will be provided, as needed 17

18 2015-2016 CPS Test System Mechanism for you to confirm that your system – Meets specifications for interfacing with CPS Is calculating correct results Allows you to – Test applications and corrections Receive ISIR data 18

19 2015-2016 CPS Test System Available late December and remains available through the end of the processing cycle User Guide will be posted to Federal Student Aid Download Web site (FSAdownload.ed.gov) around mid October 2014FSAdownload.ed.gov An Electronic Announcement will be posted when the test system goes live 19

20 2015-2016 CPS Test System Test files will be available at FSAdownload.ed.govFSAdownload.ed.gov Separate input and output files will be posted for testing specifications Remember - CPS is still in test until FSA accepts the system and production starts on January 2, 2015 20

21 Important Dates 21

22 Important Dates Mid-August 2014 2015-2016 Electronic Data Exchange (EDE) Technical Reference draft (including the ISIR Record Layout and ISIR Cross-Reference) Mid-August 2014 2015-2016 Application Processing System Specifications for Software Developers draft End of October 2014 2015-2016 EFC Formula Guide on the IFAP Web site 22

23 Important Dates October 2014 2015-2016 CPS Test System User Guide October 2014 2015-2016 Electronic Data Exchange (EDE) Technical Reference- Final October 2014 2015-2016 ISIR Guide on the IFAP 23

24 Important Dates November 2014 2015-2016 SAR Comment Codes and Text December 2014 The CPS Test System is made available 24

25 Important Dates January 1, 2015 2015-2016 FAFSA on the Web site is available to students and 2015-2016 FAA Access to CPS Online Web site January 2, 2015 The 2015-2016 CPS begins processing 25

26 Contact Information We appreciate your feedback and comments Erika Hutko Phone: 202-377-3465 Erika.hutko@ed.gov 26

27 See you next update!


Download ppt "Erika Hutko | June 2014 U.S. Department of Education Software Vendors Webinar CPS Update for Software Vendors."

Similar presentations


Ads by Google