Presentation is loading. Please wait.

Presentation is loading. Please wait.

Meso: Figs2 (Benjamina) – Exp1 29.06.2009. 08:46 after 2 fill/flush cycles.

Similar presentations


Presentation on theme: "Meso: Figs2 (Benjamina) – Exp1 29.06.2009. 08:46 after 2 fill/flush cycles."— Presentation transcript:

1 Meso: Figs2 (Benjamina) – Exp1 29.06.2009

2 08:46 after 2 fill/flush cycles

3 09:00 A spike at the end of the flush cycle followed by another one at the beginning of filling

4 09:06 the following scan at the end of that fill

5 09:16

6 10:26 Filling via PC (20 mins in)

7 11:26 12 minutes ALO

8 37min ALO

9 52min ALO

10 57min ALO

11 1 HALO

12 12:22 Arcing!

13 Reduced the upper size from 264 to 245nm

14 12:37 Still arcing

15 Reduced max size to 184nm

16 3 HOLA

17 4 HOLA

18 5h13min ALO

19 5h 24min ALO: injected 2ppb limonene

20 6HALO, 40min after Limonene injection: nothing happened!

21 30 min after second limonene injection

22 7h25min ALO: 1 h 24 mins after injection


Download ppt "Meso: Figs2 (Benjamina) – Exp1 29.06.2009. 08:46 after 2 fill/flush cycles."

Similar presentations


Ads by Google