1 Target: K. Long, 16Nov2009

2 Schedule for T2 re-instatement: T2#2: – Next steps: Non-DLC bearings: – Delay in material delivery: » Torlon delivery expected this week » Vespel (preferred material) expected 12 December In parallel: – Checking forces generated with mis-aligned coils using OPERA model (PS, TB): ongoing – Devising magnetic QA rig (GB + Shf): ongoing – Devising concept for winding coils that is more precise – Will be discussed at Trgt w/s 02Dec09 in Sheffield Schedule T3: – Machining of parts progressing well – Coils for T3 prepared in Sheffield: » Will consider whether to use new coils or present coils based on: magnetic analysis; Magnetic QA on T2 stator

3 T3 schedule: T3 schedule still looks OK: – Need to expedite ‘R&D’ work on T2#3 Which is in hand