Zanussi & Cybertec Meeting. CYBERTEC - The Planning and Scheduling Company Meeting Agenda About Cybertec The CyberPlan Planning & Scheduling Suite Cybertec.

Similar presentations


Presentation on theme: "Zanussi & Cybertec Meeting. CYBERTEC - The Planning and Scheduling Company Meeting Agenda About Cybertec The CyberPlan Planning & Scheduling Suite Cybertec."— Presentation transcript:

1 Zanussi & Cybertec Meeting

2 CYBERTEC - The Planning and Scheduling Company Meeting Agenda About Cybertec The CyberPlan Planning & Scheduling Suite Cybertec Projects at Electrolux Zanussi Cold Division in Susegana

3 CYBERTEC - The Planning and Scheduling Company About Cybertec Company Vision Technology Products Services Customers Partners

4 CYBERTEC - The Planning and Scheduling Company Cybertec: The Planning & Scheduling Company Mission: Help industrial Customers to increase resource utilization and service level and reducing stocks, product cost and human efforts Established in 1992 Average Annual grow > 50% 40 focused people; 90% graduated or PHD; Most consultants APICS CPIM certified

5 CYBERTEC - The Planning and Scheduling Company Vision Planning & Scheduling is an Hard Problem High improvement available through resource optimization and process synchronization The Computing Power has increased by orders of magnitude while the complexity of the planning problem only few times

6 CYBERTEC - The Planning and Scheduling Company Cybertec Core Technology Hardware resources –Ram based Data Bases –Cluster Of Computing Nodes Software tools –C++, Java, Windows NT, Corba Optimization techniques –Discrete Simulation, Constraints, LP,GA,…. + Practical Experience!

7 CYBERTEC - The Planning and Scheduling Company Products A complete suite of products for repetitive and complex equipment industries: –Planning –Programming –Scheduling –Management Execution Systems

8 CYBERTEC - The Planning and Scheduling Company Services Consulting Education Implementation Integration Special Projects for Hard Optimization

9 CYBERTEC - The Planning and Scheduling Company Customers Logo

10 CYBERTEC - The Planning and Scheduling Company Customer Industries Automotive Clothing Electric Electronic Food & Beverage Heavy Equipement Paper Pharmaceutical Plastics Ship building Steel Textile …

11 CYBERTEC - The Planning and Scheduling Company Partners Consulting Companies ERP Vendors MES Integrators SW Houses Universities Arthur Andersen Atos Consulting IBM JDE ORACLE SAP Orsi...

12 CYBERTEC - The Planning and Scheduling Company The CyberPlan Planning & Scheduling Suite SCD Supply Chain Designer MPS Master Production Schedule MRP Material Requirements Planning CRP Capacity Requirements Planning FCP Finite Capacity Planning FCS Finite Capacity Scheduling

13 CYBERTEC - The Planning and Scheduling Company Planning: designing for performances! To meet the market requested performance ( service level, lead times, costs) You have to design for them CyberPlan Supply Chain Designer is a new, long waited, tool that allowes to design for performace –Resource planning (equipements, personnel, tools,..) –Safety stocks and all other MRP parameters –Purchasing contract conditions (due dates, qty, safety stocks, min-max deviation,...) Same data and model used by your ERP

14 CYBERTEC - The Planning and Scheduling Company Cybertec Projects at Electrolux Zanussi Cold Division-Susegana

15 CYBERTEC - The Planning and Scheduling Company Zanussi & Cybertec Projects Completed –Short Term FCS in the moulding dpts Current –FAS & MPS Phase 1 Automated Optimal Final Assembly Scheduling Planned –FAS & MPS Phase 2 Automated Optimized Master Production Schedule Integration with Demand Management System

16 CYBERTEC - The Planning and Scheduling Company A brief introduction –It was a ‘97 project –The problem was to build an automated schedule for the daily activities of the two production departments Innerliner Thermofoaming and Innerdoor Thermofoaing. –We started with one department and after successful implementation we dealt with the other one. –The daily scheduling activities involved very experienced employees. Short Term Finite Capacity Scheduling in the Innerliner Thermofoaming and Indoor Thermofoaming departments

17 CYBERTEC - The Planning and Scheduling Company The goals Main goal: let not-experienced employees schedule the department by giving them a computerized scheduling system. Other benefits required: –Updated scheduling plans. –More detailed scheduling of the production activities. –More constraints under the planner control. –More activities better organized (machine changeover, purchasing material call-out).

18 CYBERTEC - The Planning and Scheduling Company The scheduling problem A hard set of constraints –A set of production requests with hourly due - dates for the next three days (or more). –Production & changeover activities. –Finite number of: machine operator crews set - up crews moulds Sequence dependent changeover costs: change mould change version (slight modification of the mould) same mould (change of material color)

19 CYBERTEC - The Planning and Scheduling Company Output: A production schedule for each machine such that: –satisfies the given constraints –minimizes the changeover costs –minimizes the due dates violation

20 CYBERTEC - The Planning and Scheduling Company Problem features Why the problem was so difficult –Several contraints (changeover crew, operator machine crew, moduls, …) –Sequence set - up optimization –System was to be able to suspend a production lot and continue with a more urgent lot –Very strict lots due dates Moreover…. –Easy to use and fast response system (few seconds…) –Very low level interaction with the computerized system

21 CYBERTEC - The Planning and Scheduling Company The solution Based on CyberPlan Standard Scheduling Technology : –This was the best technology availiable to solve the problem due to the number of production lots (hundreds) to be scheduled, the variety of the constraints, and the response time required.

22 CYBERTEC - The Planning and Scheduling Company Goals reached CyberPlan is now scheduling the production of both departments –For more than one year CyberPlan has been helping to better organize the production in the Innerliner Thermofoaming and Innerdoor Thermofoaming departments The scheduling of the activities in both departments are managed now by “no - guru guys”

23 CYBERTEC - The Planning and Scheduling Company Next steps What could be done –New Cybertec Advanced Scheduling Technology could be applied to reach an even better performance in the production department What will be done –Cybertec Advanced Scheduling Technology to optimize the Master Production Schedule & Final Assembly Scheduling

24 CYBERTEC - The Planning and Scheduling Company Automated Final Assembly Scheduling (FAS)

25 CYBERTEC - The Planning and Scheduling Company FAS: a brief introduction –Building a FAS follows the choice and qty of finished products to be produced in a given week. – The FAS consists in building a feasible and optimized schedule for finished products on the assembly lines. – It is the heart of the factory as it drives the production and purchaising (call out) flows of the factory. –FAS gives the “drum beat” to all of the activities in the factory. –As Zanussi-Susegana is a real Synchronous Manufacturing Environment, the FAS defines the feasible and optimal production flow of all production departments

26 CYBERTEC - The Planning and Scheduling Company The goal of FAS project: There are a lot of critical aspects the planner has to deal with to get a feasible and optimized FAS The goal is to give the FAS planner a computerized system that can help him in building and maintaining a feasible and optimized schedule. Moreover, with the support of this system the user will be able to control more constraints and optimization aspects of the production process.

27 CYBERTEC - The Planning and Scheduling Company Two different technological areas with different scheduling problems There is a substantial difference between the two main areas of the assembly process –Traditional Assembly Lines Scheduling Problem: –Find a feasible and optimal schedule of production lots –Automatic Assembly Lines Load Balancing & Scheduling problem –Find a production daily rate and optimal schedule of production lots

28 CYBERTEC - The Planning and Scheduling Company The FAS Scheduling Problem Due dates of the production lots Sequencing rules that are used to optimize the chenge over costs in the production flow –At present, more seven sequence optimization rules must be taken simultaneously in count when building a schedule ! Critical constraints that must be satisfied –Foaming Moulds –Welding Machine Critical resources that must be highlighted –“Round Door” production

29 CYBERTEC - The Planning and Scheduling Company The Loading Problem Definine the optimal daily production rate for each automatic assembly line under –Capacity constraints no more than x items can be produced in a given “ring” –Optimization criteria a given efficiency must be guarantee

30 CYBERTEC - The Planning and Scheduling Company The FAS System Schedule Assembly Line Scheduling

31 CYBERTEC - The Planning and Scheduling Company The FAS critical resources load Overload!

32 CYBERTEC - The Planning and Scheduling Company The New Automated MPS System

33 CYBERTEC - The Planning and Scheduling Company Automated Optimized Master Production Scheduling System The problem is to define which finished products have to be produced in each week of the planning period Problem data: –a customer priority class –a minimum level of customer service for each class of priority –a minimum level of resourcce utilization –a set of customer’s requests for each week –the assembly lines capacity and the capacity of other critical resources –the bill of critical resources of each product –a set of production constraints (min production lot for model plant or pnc, max …)

34 CYBERTEC - The Planning and Scheduling Company Quality optimization measures A feasible master production plan –defines what to produce (which finished products) and how much (how much for each PNC) under respect of the capacity constraints Customer Service level –for each priority class the customer service level is defined: (number of satisfied customers’ demands)/(number of customers’demands)

35 CYBERTEC - The Planning and Scheduling Company The goal Find an automated feasible master production plan which: 1. guarantees a minimum level of customer service 2. the remaining capacity is allocated to satisfy the customers’ demands according to the priority class defined

36 CYBERTEC - The Planning and Scheduling Company Output The amount of each PNC (finished product) that must be produced on week_i The list of customers’ demands which will be satisfied The list of customers’ demands which will not be satisfied –The level of customer service –The level of resources utilization –Alarms

37 CYBERTEC - The Planning and Scheduling Company Input Customer Requests Customer Priority Class

38 CYBERTEC - The Planning and Scheduling Company Fast & Easy Execution Executing Command

39 CYBERTEC - The Planning and Scheduling Company Unsatisfied constraints Unsatisfied Customer Requests

40 CYBERTEC - The Planning and Scheduling Company Results Control Panel showing the customer satisfaction level Master Production Schedule Workbench