Download presentation
Presentation is loading. Please wait.
1
Michael Scharfenstein FAC Meetingscharf@slac.stanford.edu April 7, 2005 LCLS ES&H Process and Documentation
2
Michael Scharfenstein FAC Meetingscharf@slac.stanford.edu April 7, 2005 Introduction Work processes to date Relying on partner institution ISMS programs Full Time LCLS ESH Support March 16, 2005 Path Forward Establish a uniform & coherent ESH approach DOE O 413.3 Program Management DOE O 440.1 Construction Safety Management Guide Identified needed directives and procedures for systems development
3
Michael Scharfenstein FAC Meetingscharf@slac.stanford.edu April 7, 2005 Project ESH Documentation Preliminary Hazards Analysis Document Become the basis for the PSAD Environmental Assessment Fire Hazards Analysis LCLS ESH/Citizens Committee Interface Approach (Algorithm) Project ESH Directive
4
Michael Scharfenstein FAC Meetingscharf@slac.stanford.edu April 7, 2005 Project ESH Directive LCLS Project Management ESH Policy and Expectations Integration of ESH requirements into project engineering and design Link to ESH Guidance Documents
5
Michael Scharfenstein FAC Meetingscharf@slac.stanford.edu April 7, 2005 LCLS ESH Guidance Conventional Facility Design/Construction Process Technical Systems Engineering/Design Process (ESH) Procurement / ESH Process Installation & Approval Process (Accelerator Readiness Review – Precursor)
6
Michael Scharfenstein FAC Meetingscharf@slac.stanford.edu April 7, 2005 Challenges Establish project buy-in to a uniform technical system “Design/Engineering Process” Establish SLAC buy-in to the process Identified Stakeholders
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.