Presentation is loading. Please wait.

Presentation is loading. Please wait.

Michael Scharfenstein FAC April 7, 2005 LCLS ES&H Process and Documentation.

Similar presentations


Presentation on theme: "Michael Scharfenstein FAC April 7, 2005 LCLS ES&H Process and Documentation."— Presentation transcript:

1 Michael Scharfenstein FAC Meetingscharf@slac.stanford.edu April 7, 2005 LCLS ES&H Process and Documentation

2 Michael Scharfenstein FAC Meetingscharf@slac.stanford.edu April 7, 2005 Introduction Work processes to date Relying on partner institution ISMS programs Full Time LCLS ESH Support March 16, 2005 Path Forward Establish a uniform & coherent ESH approach DOE O 413.3 Program Management DOE O 440.1 Construction Safety Management Guide Identified needed directives and procedures for systems development

3 Michael Scharfenstein FAC Meetingscharf@slac.stanford.edu April 7, 2005 Project ESH Documentation Preliminary Hazards Analysis Document Become the basis for the PSAD Environmental Assessment Fire Hazards Analysis LCLS ESH/Citizens Committee Interface Approach (Algorithm) Project ESH Directive

4 Michael Scharfenstein FAC Meetingscharf@slac.stanford.edu April 7, 2005 Project ESH Directive LCLS Project Management ESH Policy and Expectations Integration of ESH requirements into project engineering and design Link to ESH Guidance Documents

5 Michael Scharfenstein FAC Meetingscharf@slac.stanford.edu April 7, 2005 LCLS ESH Guidance Conventional Facility Design/Construction Process Technical Systems Engineering/Design Process (ESH) Procurement / ESH Process Installation & Approval Process (Accelerator Readiness Review – Precursor)

6 Michael Scharfenstein FAC Meetingscharf@slac.stanford.edu April 7, 2005 Challenges Establish project buy-in to a uniform technical system “Design/Engineering Process” Establish SLAC buy-in to the process Identified Stakeholders


Download ppt "Michael Scharfenstein FAC April 7, 2005 LCLS ES&H Process and Documentation."

Similar presentations


Ads by Google