Presentation is loading. Please wait.

Presentation is loading. Please wait.

Material Requirements Planning for small manufacturers Theodore House.

Similar presentations


Presentation on theme: "Material Requirements Planning for small manufacturers Theodore House."— Presentation transcript:

1 Material Requirements Planning for small manufacturers Theodore House

2 Use Cases Login View All Assets Search Asset Remove Asset View Bill of Materials View Parts Documentation Edit Vendor Information

3 Manufacturers All materials assigned internal inventory part number Multiple manufactures may produce cross compatible parts Goodyear and Bridgestone manufacture tires Same tire different part number May prioritize manufacturers (quality, etc.)

4 Vendor Vendor of the part – may be the manufacturer of the part – or a distributor that buys large volumes from the manufacturer Based on price, the physical proximity of stocking warehouses,

5 The Login Page

6 Viewing All Inventory

7 Oh No Changing the Design How do I solve the problem of dragging and dropping – Adding a part to a BOM – BOM may take quantities of parts Designation – Dragging a part to work order? A single all in one interface might work? Am I working at the same place?

8 A Brainstorm Event


Download ppt "Material Requirements Planning for small manufacturers Theodore House."

Similar presentations


Ads by Google