1
MAUA SHIPYARD
3
SITES LOCATION EISA BRAZIL RIO DE JANEIRO OPEN SEAS
4
HISTORY: MAUÁ IS FIRST SHIPYARD OF BRAZIL
Investment of the new shipyard. Delivered 72 ships = 36 military vessels + 36 merchant ships. New investments Delivered 130 merchant ships Re-activation with the offshore platforms Baron of Mauá P1 First Brazilian platform
5
SITE 1 – PONTA D’AREIA DRY DOCK L: 167 m B: 22.5 m SLIPWAY L: 238 m
FLOATING CRANE 2050 ton
6
SITE 2 – ILHA DO CAJÚ
7
SITE 4 – ESTALEIRO NAVAL SYNERGY
(On re-activation) June 09
8
SITE 4 – ESTALEIRO NAVAL SYNERGY
(On re-activation) Area m2
9
MAIN ACTIVITIES ENGINEERING - TOTALLY INTEGRATED
INSPECTION & DIAGNOSIS INTEGRATION & COMISSIONING BASIC & DETAILED DESIGN PRODUCTION SUPPORT SHOP DRAWING & SCOPE CONTROL PROCUREMENT & DILIGENCY
10
MAIN ACTIVITIES LOCAL AND INTERNATIONAL PROCUREMENT PORT TERMINAL
Private Port integrated into the industry logistics Own staff (no port union); Customs clearance; Special customs – “DAC” (storage certified customs); Equipments to load / unload heavy cargo Stuffing and stripping of containers; Unique EDC (Environmental Defense Center) in the Guanabara Bay.
11
RIG REPAIR & RIG UPGRADES
SHIP REPAIR
12
QSHE QUALITY SAFETY & HEALTH (Following OHSAS 18.001) ENVIRONMENT
(ISO 9001/2000) Certified since 2002 SAFETY & HEALTH (Following OHSAS ) ENVIRONMENT (ISO 14001/2004) Certified since 2005 Non Lost Time Accident P54 over mh PMXL1 over mh
13
MAIN CONTRACTS - OFFSHORE
TOPSIDE CONSTRUCTION HULL INTEGRATION COMMISSIONING P-43 P-50 TOPSIDE CONSTRUCTION P-54
14
G MAIN CONTRACTS - OFFSHORE TOPSIDE AND JACKET CONSTRUCTION
OFFSHORE HOOK UP COMMISSIONING G
15
MAIN CONTRACTS - REPAIR AND UP GRADE
Atlantic Zephir Leo Segerius Paul Wolff South Atlantic - OCT Olinda Star, Roger Eason and Ocean Clipper
16
PROJECT MANAGEMENT - RELEVANT REMARKS
METHODOLOGY CLIENT BOARD PROJECT MANAGER PMO DEPARTMENTS SUBCONTRACT