The CITRIS Building An Interdisciplinary IT Building (140k gsf, 80k asf, 7 stories) u Micro-Nano-fab Laboratory (20k asf) u Distance Learning Facilities.

Similar presentations


Presentation on theme: "The CITRIS Building An Interdisciplinary IT Building (140k gsf, 80k asf, 7 stories) u Micro-Nano-fab Laboratory (20k asf) u Distance Learning Facilities."— Presentation transcript:

1 The CITRIS Building An Interdisciplinary IT Building (140k gsf, 80k asf, 7 stories) u Micro-Nano-fab Laboratory (20k asf) u Distance Learning Facilities u High-tech Classrooms u Interdisciplinary Research Space u A new focal point for COE Integrate with COE Master Plan 

2 Sutardja-Dai Hall & Marvell Lab u A Brief review of the construction

3 Demolition of Old Davis Hall Sept. 2004

4 Excavation (next to Cory Hall) Excavation (next to Cory Hall) Dec. 2004

5 A Big Hole … 5/2005 - 7/2006

6 A Crane, 190 feet tall, Aug. 2006

7 View from the Top (Shackleton, Séquin)

8 The Steel Frame Starts to Grow Oct. 2006

9 Wall Constructions, Dec. 2006

10 Concrete Pour, Feb. 2007

11 More Steel … Much More!

12 Topping-out Ceremony, March 2, 2007 u Honoring Dean A. R. Newton ( 1951 - 2007)

13 Roof and “Penthouse” Construction

14 Hanging GFRC Facade, Aug. 2007

15 Waffle Slab for Marvell Lab, Oct. 2007

16 Topping-out the Marvell Lab, Dec. 2007

17 Marvell Lab, Jan. 2008

18 Terrace at Level 6, next to Davis Hall, Feb. 2008

19 Hoisting a Big Air Handler, Mar. 2008

20 Sutardja-Dai Hall & Marvell Lab u A look of what is going on inside

21 Level 1: Computer Room

22 Level 1: Corridor

23 Level 1: Future “Macro-Lab”

24 Level 1: Utilities under Marvell Lab

25 Level 2: Machinery under Marvell Lab

26 Level 2: Peet’s CyberCafe

27 Level 2: Distance Learning Rooms

28 Level 2: Atrium Stairs

29 Level 3: Atrium

30

31 Level 3: Auditorium

32 Level 3.5: Lower Marvell Lab u (Photolithography)

33 Level 3.5: Marvel Lab (Air Filtration)

34 Level 4: Carrel Space (West)

35 Level 5: Carrel Space (East)

36 Level 5: Lab Administration

37 Level 5: Upper Marvell Lab u (Diffusion Furnaces)

38 Level 6: Terrace

39 Level 6: Bridge to Cory

40 Level 6: Lounge

41 Level 6: Lounge (and view)

42 Level 6: Carrel Space (East)

43 Level 7: Carrel Space (East)

44 Level 7: Carrel Space (West)

45 Level 7: Carrel Space (East)

46 Level 8: Roof (March 2008)

47 Roof (April 2008)

48 Roof: Air-Handler Maze

49 Level 9: View of Marvell Lab Roof (Mar. 2008)

50 Marvell Micro- Nano-Lab

51 Equipment Replacement Bay

52 CITRIS Davis Hall (CEE) Cory Hall (EECS)

53 Sutardja-Dai Hall, April 10, 2008

54 Sutardja-Dai Hall: Status Summary u It is real u It is on schedule u Move-in starts January 2009 u Grand opening on March 6, 2009 u Initial occupancy is being finalized now...

55 Initial Occupancy (tentative) -- Phase 1 Move-in u F7: AI, Robotics, Machine Learning u F6: MEMS Applications, Sensors & Control u F5: Micro- & Nano- Device Technology u F4: Design, New Media, Human-Computer Interface u F3: CITRIS & GLOBE administration; Auditorium. u F2: CyberCafe, Seminar rooms, 24-7 IT room. u F1: Computer room, Macro-Lab, Motion Capture.


Download ppt "The CITRIS Building An Interdisciplinary IT Building (140k gsf, 80k asf, 7 stories) u Micro-Nano-fab Laboratory (20k asf) u Distance Learning Facilities."