Presentation is loading. Please wait.

Presentation is loading. Please wait.

Portable Control & Measurement Device D0727 Aviv Rosenberg Ben-Ami Zilber Supervisor: Boaz Mizrachi (Zoran)‏ End of Part A Presentation 12/2008.

Similar presentations


Presentation on theme: "Portable Control & Measurement Device D0727 Aviv Rosenberg Ben-Ami Zilber Supervisor: Boaz Mizrachi (Zoran)‏ End of Part A Presentation 12/2008."— Presentation transcript:

1 Portable Control & Measurement Device D0727 Aviv Rosenberg Ben-Ami Zilber Supervisor: Boaz Mizrachi (Zoran)‏ End of Part A Presentation 12/2008

2 Overview (Reminder...)‏ A versatile, multi-purposed, portable and low-priced measurement device that can instantly measure and display results, or store data for later re-evaluation. The device will be easy to use and will allow some degree of monitoring and control over its environment using various measurements. In addition, Possibility of customization and extension of feature-set in HW & SW Possibility to assemble several versions of the device Friendly interface (Cell-Phone like keyboard, LCD Display)‏ Portable and hand-held with internal rechargeable battery Support for USB and microSD card for data transfer

3 So Far... Preliminary design and characterization. Found necessary HW for all features. Detailed mechanical design in a 6.1x10x2.5cm box, with 3D model ensuring all HW can fit in such a small device. Electrical design for all possible hardware. (in progress) Layout.

4 Mechanical Design The device with closed top. Visible: Graphic LCD, Keypad, IRt/c, UV Sensor.

5 Mechanical Design The device with open top. Visible: Graphic LCD, Keypad and Main PCB, USB Port.

6 Mechanical Design The device with open top, LCD and Keypad removed. Visible: Main PCB, most sensors and components.

7 Electrical Design Functional Block Diagram:

8 Electrical Design Example Schematic: Accelerometer

9 Electrical Design Example Simulation: Pressure Sensor

10 Layout Suggested main PCB layout: Top

11 Layout Suggested main PCB layout: Bottom

12 Layout Actual main PCB layout: Top

13 Layout Actual main PCB layout: Bottom

14 To Do...  Finish PCB layout (mid of December)‏  Send to production (January)‏  Start basic SW while in production (~1 Month)‏  End of production (before end of January)‏  HW Test and Debug (1-2 Months)‏  More SW (all remaining time)‏

15 Any Questions...?


Download ppt "Portable Control & Measurement Device D0727 Aviv Rosenberg Ben-Ami Zilber Supervisor: Boaz Mizrachi (Zoran)‏ End of Part A Presentation 12/2008."

Similar presentations


Ads by Google