Chapter 8 Information Systems Development and Acquisition

Similar presentations


Presentation on theme: "Chapter 8 Information Systems Development and Acquisition"— Presentation transcript:

1 Chapter 8 Information Systems Development and Acquisition

2 Learning Objectives 1. Understand the process used by organizations to manage the development of information systems 2. Describe each major phase of the system development life cycle: systems identification, selection, and planning; system analysis; system design; system implementation; and system maintenance

3 Learning Objectives 3. Describe Prototyping, rapid application development, object-oriented analysis, and design methods of systems development along with each approach’s strengths and weaknesses 4. Understand the factors involved in building a system in-house, along with situations in which it is not feasible

4 Learning Objectives 5. Explain three alternative systems development options: external acquisition, outsourcing, and end user development

5 Developing Systems Systems Analysis and Design
A traditional term used to describe the process of designing, building, and maintaining information systems performed by analysts and programmers Software Engineering A newer term given to acknowledge the movement of systems building from art to discipline by professionals using common methods, techniques, and tools for constructing information systems Problem Decomposition Systems building is a process of decomposing large complex problems to discover and design solutions to support the organization

6 Problem Decomposition

7 Options for Acquiring System Capabilities
Important Slide

8 The Systems Development Life Cycle
The System Development Life Cycle (SDLC) is a structured method complete with techniques developed to manage the life cycle of an information system Important slide

9 System Identification, Selection, and Planning
Phase 1 of the SDLC. The goal of this phase is simply to identify and select a development project from all of the possible projects that could be performed. (Achieving this goal may be complicated, but the goal itself is intuitive and simple.)

10 System Identification, Selection, and Planning
A process used to identify opportunities for developing systems projects to solve problems. This process varies greatly from organization to organization Selection The process of applying evaluation criteria to possible projects to select those that are critical to enabling the organization’s mission, goals, and objectives Systems Planning Developing formal plans for creating the information systems project selected. Some organizations call their periodic process of identification, selection, and planning “Information Systems Planning (ISP)”

11 System Identification, Selection, and Planning
Criteria for evaluating and selecting a systems project What are some of the important criteria for selecting a project? Why? How do you measure some the evaluation criteria listed above? Why is measurement important?

12 Systems Analysis Phase 2 of SDLC.

13 Systems Analysis Collecting System Requirements (Traditional)
A combination of methods are used: Interviews – discussions with stakeholders (i.e. users) Questionnaires – surveys to assess use and attitudes Observations – watch process and systems use Document Analysis – reviewing current documents Collecting System Requirements (Alternative) A combination of traditional methods are used: Critical Success Factors (CSF’s) – a process of interviewing, recoding, analyzing, and merging factors defined as critical by personnel at all levels of an organization Joint Application Design (JAD) - a method that brings users and analysts in a room together to define requirements. This method greatly reduces time Different ways of collecting system requirements. A CSF is simply something that must go well to ensure success for the stakeholder (manager, department, division, or organization).

14 Systems Analysis - Critical Success Factors
Strengths and weaknesses of CSF approach.

15 Systems Analysis - Joint Application Design
JAD is a special type of a group meeting in which all (most) users meet with an analyst at the same time Users jointly define and agree upon system requirements or design dramatically reducing the design time

16 System Analysis – Modeling Organizational Data
The ERD (Entity Relationship Diagram) A tool used to identify the relationships between entities to assist in developing applications and databases We’ve already done this. It is used to model organizational data that will be used within the context of the IS.

17 Requirements, Data, Data Flows, Processing Logic
It is also important to understand how the data moves through an organization. Processing logic represents the way in which data are transformed. It is often expressed using pseudo code.

18 System Design Phase 3 of SDLC. The details of the chosen approach are developed in this phase.

19 System Design - Designing Forms and Reports
Forms - a business document with predefined data and places to fill in information that is used for system input Reports – an output of a system that contains only predefined data usually in a tabular format (see below) Does this look familiar? It should, we did similar tasks in MS Access.

20 System Design - Designing Interfaces and Dialogues
An Example of a User Interface - Google There are entire books written on UI design and usability on the web. The guru on this topic is Jakob Nielsen. His website is:

21 System Design - Designing Databases and Files
We’ve already done this stuff – database design.

22 System Design – Designing Processing Logic
The processing and logic operations of an information system are the steps and procedures that transform raw data inputs into new or modified information Processing Logic Example Describes the steps for calculating a GPA Obtain the prior grade point average, credits hours earned, and list of prior courses Obtain the list of each current course, final grade, and course credit hours Combine the prior and current credit hours into aggregate sums Calculate the new grade point average

23 System Implementation
Phase 4 of the SDLC.

24 System Implementation – Programming and Testing
Software Programming – creating the instructions from the programming logic design using a variety of programming languages assisted many times by language editors Software Testing – a series of tests designed to identify errors and validate logic in parallel with programming. There are multiple types of testing (see below) Now we get to the part of actually coding/writing the software. The language(s) used depend on the context of the project and the organization’s preferences.

25 System Implementation – System Conversion
Conversion Approaches – the process of taking information from an old system to populate a new system. This is accomplished through manual and/or automated methods Important slide. These are the typical ways systems are converted from old to new.

26 System Implementation – System Documentation
The collection of materials produced with an information system to support the ongoing operation and development Documentation Types User and reference guides – step-by-step instructions for using the system features and functions User training and tutorials – manuals and exercises designed to educate users and build competence in system use. These training manuals and tutorials can be supported by a database that utilizes realistic data Installation procedures and trouble-shooting suggestions – manuals and procedures designed to support technical personal in installing and problem solving during system operation Are these really necessary? Why or why not? Larger corporations have people dedicated to writing the technical documentation.

27 System Implementation – System Training
Training Approaches – the processes used to educate users in new business processes and system features and functions with the goal of building competence to ensure operational success (see possible methods below) This is an often overlooked, but necessary, part of the IS implementation. Why do you think it is overlooked? Why do you think it should NOT be overlooked? (Or should it?)

28 System Maintenance Final (fifth) phase of SDLC.

29 System Maintenance - Maintenance Types
The process by which a system is kept in working order and minor enhancements are completed. Some types of system maintenance are shown below Good slide to know.

30 Alternative Development Methods - Prototyping
A systems development method that uses a “trial-and-error” approach for discovering how a system should operate. Steps include: Collecting requirements Develop/Refine Prototype Review Prototype with Users (Repeat the previous steps until correct design is created) Implement and Use System SDLC is not the only way to develop systems. Prototyping is a good way to develop systems, especially smaller ones.

31 Alternative Development Methods – RAD
Rapid Application Development (RAD) A rapid four-step iterative systems development method utilizing: prototyping, computer-based development tools, special management practices, and close user involvement RAD Phases The following phases are iterated until the requirements and design are completed and approved Requirements Planning User Design Construction Move to the New System The advantages here include the close user involvement and the iterative nature of the process. Having close user involvement helps ensure that the end-users will actually use the system. The iterative process allows the developers to continually give updates to the end-users.

32 Alternative Development Methods – Object-Oriented
Object-Oriented Analysis and Design (OOAD) Similar to SDLC approaches except that it relies on the tight coupling between data and methods and between the conceptual design of a system and its actual implementation. OOAD Characteristics The role of analyst and programmer are combined while thinking about data and the operations to define the relevant objects The design and implementation of these objects happen quickly and simultaneously It uses a more integrative prototyping process than the SDLC

33 Alternative Development Methods – A Comparison

34 Needs for Alternatives to Internal Systems Building
Many times it is not feasible to consider building an information system internally. Below are four situations that discourage the idea of developing a system internally Limited IS Staff Limited IS Skill Sets IS Staff is Overworked Problem IS Performance The IS organization does not have the capability to build the system itself The IS organization does not have personnel with the correct skill sets to build the system Current IS organization staff demands and priorities make it impossible to build a system The IS organization does not have the appropriate performance level to build a system When to NOT build in-house.

35 Alternatives to Internal Development
External Acquisition The purchasing of an existing system (hardware, software, databases, network) from an outside vendor such as IBM, EDS, or Accenture Outsourcing Turning over some or all responsibility for an organization’s information systems development and operations to an outside firm End-user Development Capitalizing on the sophistication of current users, this technique allows the system users to develop their system functions using a variety of tools

36 External Acquisition – Steps to Proceed
Steps in External Acquisition System identification, selection, and planning (same as internal method) Systems analysis (same as internal method) Development of a request for proposal (RFP) – a report that is used to tell vendors what the requirements are and how they might be able to meet those requirements (hardware and software) Proposal evaluation – may include viewing system demonstrations, evaluating the performance of those systems, and examining criteria important to the organization and judging how the proposed systems respond to those criteria Vendor selection – using a scoring system devised to evaluate the competing proposal and then selecting the proposal that best fits the organization’s needs

37 External Acquisition – The RFP (Request for Proposal)

38 External Acquisition - Proposal Evaluation Criteria

39 Outsourcing – Why Consider?
A firm might outsource some (or all) of its information system service for many reasons: Cost and quality concerns – current cost and quality of information systems is unacceptable Problems in IS performance – IS is having trouble meeting acceptable service standards Supplier pressures – aggressive sales tactics Simplifying, downsizing, and reengineering – having a need to focus on core processes Financial factors – turning over IS systems can strengthen a balance sheet Organizational culture – political or organizational problems that are difficult for IS to overcome Internal Irritants – tension between the IS staff and users What’s the difference between outsourcing and off-shoring?

40 Outsourcing – Types of Arrangements
Outsourcing Arrangements Not all outsourcing arrangements are the same, they can vary based on the need of the firm and the supplier Arrangement Types Basic – A “cash and carry” relationship in which products and services are purchased on the basis of price and convenience Preferred – relationships with a few suppliers where the buyer and supplier set preferences and prices based to the benefits of each other (e.g. volume pricing) Strategic – a relationship where the firm and a vendor are each concerned with, and perhaps have a direct stake in, the success of each other

41 Outsourcing – Relationship Management
Managing the IS Relationship Ongoing management of the outsourcing alliance is the single most important aspect of the outsourcing project’s success. The following are recommendations for the best management: A strong CEO and CIO should continually manage the legal and professional relationship with the outsourcer Clear, realistic performance measurements of the systems and of the out sourcing arrangement (e.g. tangible and intangible costs) The interface between the customer and outsourcer should have multiple levels (i.e. the links to deal with policy and relationship issues)

42 End-User Development – Tools
Many tools can be used by end-users for business applications including some of the following: Personal Computer Tools – tools common to PCs (e.g. spreadsheets) that allow the creation of macros or automated routines by users Query languages/report generators – tools that utilize SQL to extract information from databases and generate reports in user-specified formats Graphics generators – tools that can extract relevant information from databases and create graphs, charts, etc. Decision Support and Modeling Tools – tools that support complex decision making utilizing multidimensional models Application Generators – tools that allow users to specify what is to be done and the application decides how it is to be done and generates the program code

43 End-User Development – Benefits
Embracing end user development can help address some common issues with IS development including: Cost of labor – IS managers can substitute hardware and the systems for users to develop systems for IS staff Long development time – allowing users to develop, shortens development lead times Slow modification – users can react to their own needs Work overload – leveraging the talent of the end user staff, in effect, increases the size of the IS staff Good to know.

44 End-User Development – The Benefits

45 End-User Development – Pitfalls
End-user development is not a panacea, common issues arises as it use become for prevalent including: Lack of Standards – if users do not adopt standards used by IS professionals (documentation, error checking, testing procedures), the IS staff can experience problems when supporting users, or troubleshooting data integrity and security problems when enterprise systems are involved Lack of continuity – as users leave the organization or department, new employees may not understand existing programs and lose productivity learning or developing new applications or “reinventing the wheel” Appropriate Use of Time – there is debate whether it is appropriate for skilled users and managers to be spending time on systems development Good to know.