Sogin’s mission Post Operation activities of the four Italian NPPs Decommissioning, Spent Fuel Management and sites restoration and /or reutilization Third.

Similar presentations


Presentation on theme: "Sogin’s mission Post Operation activities of the four Italian NPPs Decommissioning, Spent Fuel Management and sites restoration and /or reutilization Third."— Presentation transcript:

1 Sogin’s mission Post Operation activities of the four Italian NPPs Decommissioning, Spent Fuel Management and sites restoration and /or reutilization Third Parties Activities

2 Decommissioning & Operation G. Bolla (*) Decommissioning & Operation G. Bolla (*) Engineering M. Nobile Engineering M. Nobile Fuel Storage I. Tripputi Fuel Storage I. Tripputi Business Development F. Muzzi (**) Business Development F. Muzzi (**) Caorso NPP G. Ghioni Caorso NPP G. Ghioni Latina NPP M. Sturvi Latina NPP M. Sturvi Garigliano NPP E. Bastianelli Garigliano NPP E. Bastianelli Radiation Protection A Garofalo Radiation Protection A Garofalo Trino V. NPP M. Del Lucchese Trino V. NPP M. Del Lucchese Environment S. D’Offizi Environment S. D’Offizi SICN Activity S. Piro Planning & Development D. Campolo Quality Assurance L. Noviello Finance & Administration G. Bolognini Finance & Administration G. Bolognini Information System M. Parlanti Information System M. Parlanti Human Resources T. Dian Human Resources T. Dian Legal R. Ciccarello Legal R. Ciccarello Board of Directors Chairman C.E.O. M. Cumo R. De Felice Directors F. Carpentieri R. Cocchi T.M. Fanelli Organization chart (*) G. Bolla C.E.O. Assistant for decommissioning (*) F. Muzzi C.E.O. Assistant for third parties activity

3 University degree 15% High school diploma 35% Other 50% Total employed as at Oct. 01 2001 = 628 people Employees subdivided according to education

4 CAORSO BWR - 860 MW Operation: 1978 -1986 energy produced: 29 TWh TRINO VERCELLESE PWR - 270 MW Operation: 1965 - 1987 energy produced: 26 TWh LATINA Gas - Graphite - 210 MW Operation: 1963 - 1986 energy produced: 25 TWh GARIGLIANO BWR - 160 MW Operation: 1964 - 1978 energy produced: 12,5 TWh Sogin’s NPPs

5 ENEL decommissioning strategy 1999 ~ 2050 MCPP CPP ~ 40 years Site restoration MCPP:Safe store preparatory works CPP:Safe store

6 The new approach to the decommissioning The new inputs given to SOGIN by the Italian Government are :The new inputs given to SOGIN by the Italian Government are : -condition all the radioactive waste existing on the NPPs within the year 2010 -release all the nuclear sites – free of radiological constraints - by 2020 The last task is conditioned by availability of the national waste repository from the year 2009The last task is conditioned by availability of the national waste repository from the year 2009

7 Garigliano Trino Caorso Latina 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Licensing - Activity compatible with both strategies (Safe store / Prompt decomm.) Final dismantling / site restoration Dismantling preparatory activities Final dismantling / site restoration Reactor and auxiliary system dismantling Final dismantling / site restoration Reactor and auxiliary system dismantling Dismantling preparatory activities Final dismantling / site restoration Fuel removal and storage 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Authorisation for construction national repository Start operation national repository Licensing - Activity compatible with both strategies (Safe store / Prompt decomm.) Key events The new SOGIN plans

8 Three main steps of the new decommissioning strategy 2000 - 2005 (a) 2005 - 2008 (b) 2009 – 2020 (c) (b)Preparatory activities for final dismantling. Waste produced can be managed on site (c)Nuclear island dismantling (a)Dismantling of BOP and Conventional Building. (Activities compatible with both SAFESTORE and DECON strategies).

9 0 25 50 75 100 125 150 175 200 225 250 20012002200320042005200620072008200920102011201220132014201520162017201820192020 Mln € 0 250 500 750 1.000 1.250 1.500 1.750 2.000 2.250 2.500 2.750 Mln € Annual cost (Mln €)Cumulative cost (Mln €) Total costs of decommissioning

10 Dismantling - 69% Spent fuel management - 22% General cost - 9% Total costs of decommissioning


Download ppt "Sogin’s mission Post Operation activities of the four Italian NPPs Decommissioning, Spent Fuel Management and sites restoration and /or reutilization Third."