Team 7: Engineering an Alternate Route to Styrene.

Similar presentations


Presentation on theme: "Team 7: Engineering an Alternate Route to Styrene."— Presentation transcript:

1 Team 7: Engineering an Alternate Route to Styrene

2 Larae Baker Adam Jones Michael Heslinga Jonathan Bush Maxine Bent

3 Outline Re-introduction Design Process Struggles Changes

4 Re-Introduction Design a styrene plant on HYSYS, a computer simulator –Capacity: 2 billion lbs/year –$0.70/lb –14% of US production New chemical process –Ethane instead of Ethylene

5 Design Process Research Base Case Detailed Equipment Design –Reactors –Separations –Other equipment Economic Optimization Finalized Design

6 Process Design

7 Struggle Separations –Not in patents –Heuristics No kinetic data –Cannot determine a rate law –Assumed conversion and selectivity

8 Changes since December Kinetics Working base case Optimization beginning Catalyst regeneration plan More detailed schedule Plant Details –50-60 acres –Texas/Louisiana

9 THANKS FOR LISTENING! QUESTIONS?