Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 4 August 2003 Sam Burke UCSB HEP Group
2
Slide 2UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Progress ARC Interface Electronics Design à LVDS to CMOS NIM Converter à NIM Module fabrication underway Cold Box Cover surfacing to improve seal
3
Slide 3UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB Hybrid Cold Box
4
Slide 4UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE LVDS to CMOS NIM
5
Slide 5UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE LVDS/CMOS Converter INPUTS à 2ea LVDS (from ARC) à 1ea CMOS Enable (from cold box system) OUTPUTS à 2ea 5v CMOS (to Hybrid pulse
6
Slide 6UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE LVDS/CMOS NIM Module
7
Slide 7UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Cold Box Cover
8
Slide 8UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Future Plans Seal up remaining air leaks in Cold Box Calibrate UCSB Hybrid Cold Box after sealing à CERN Box is 25min on cooling à CERN Box is 3min on heating Cooling Rate Study à Chiller water temperature –Room Temp / Dew Point / 5 deg C
9
Slide 9UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Cold Box Air Lock
10
Slide 10UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Future Plans Verify Air Flow sensor calibration à New FR1005 Air 0.40 L/min*volt +-3% Integrate Cold Box System with 4 Hybrid ARC Stand in Clean Room