Presentation is loading. Please wait.

Presentation is loading. Please wait.

VieVS User Workshop 7 – 9 September, 2010 Vienna VIE_SCHED Jing SUN.

Similar presentations


Presentation on theme: "VieVS User Workshop 7 – 9 September, 2010 Vienna VIE_SCHED Jing SUN."— Presentation transcript:

1 VieVS User Workshop 7 – 9 September, 2010 Vienna VIE_SCHED Jing SUN

2 VieVS User Workshop 20102 Part I : Background Part II : Workflow Part III : VLBI2010 simulations Part IV : Next step

3 Backgroud VieVS User Workshop 20103 What’s the purpose of a scheduling program ? Scheduling Program Station prc file, snp file DRUDG FS Correlator skd file log file

4 Backgroud VieVS User Workshop 20104 Current scheduling program sked : Goddard, ftp://gemini.gsfc.nasa.gov/pub/sked/ ftp://gemini.gsfc.nasa.gov/pub/sked/ sched : NRAO, http://www.aoc.nrao.edu/software/sched/in dex.html http://www.aoc.nrao.edu/software/sched/in dex.html...

5 Backgroud VieVS User Workshop 20105 VLBI2010 Project 1 mm measurement accuracy on global baselines continuous measurements for time series of station positions and EOP turnaround time to initial geodetic results of less than 24 hrs. VIE_SCHED small fast-moving antennas broadband frequency (2–14 GHz) two or more antennas at a site …

6 Workflow VieVS User Workshop 20106 Input Station antenna.cat : antenna information catalog file position.cat : station x,y,z locations catalog file equip.cat : equipment IDs catalog file mask.cat : horizon and coordinate masks catalog file Source source.cat : source positions file flux.cat : source fluxes file

7 Workflow VieVS User Workshop 20107 Read station info from cat files, Read source info from cat files Calculate rise/set Schedule subconfiguration Output scheduling info Calculate slewing time to the new source Calculate scan lengths Check source position at the end of the observation Calculate start time of the observation loop

8 Workflow VieVS User Workshop 20108 Output skd file (sked/sched) NGS file sked2ngs

9  18 stations network  4 different 24 hour operating schedules VLBI2010 simulations

10 scheduleXp,Yp,UT1 (uas,uas,uas) from IGG Xp,Yp,UT1 (uas,uas,uas) from GSFC 41 hour session[34 41 24][28 19 15] 42 hour session [27 28 16] [15 9 12] 1 hour session [27 27 16] [18 10 11] 24 hours continuous session [10 12 6] [10 7 9] VieVS User Workshop 201010 VLBI2010 simulations schedule3D RMS (mm) from IGG 3D RMS (mm) from GSFC 41 hour session8.178.4 42 hour session6.255.8 1 hour session6.115.6 24 hours continuous session 3.303.3

11 4*1 hour session from VIE_SCHED4*1 hour session from SKED number of scans480653 number of sources263163 number of obs1838315927 3D RMS (mm)11.212.4 VieVS User Workshop 201011 VLBI2010 simulations Schedule from skedSchedule from VIE_SCHED

12 logical algorithm optimization criteria twin/multiple telescopes interactive interface Next step

13 Thanks for your attention ! VieVS User Workshop 201013


Download ppt "VieVS User Workshop 7 – 9 September, 2010 Vienna VIE_SCHED Jing SUN."

Similar presentations


Ads by Google