Download presentation
Presentation is loading. Please wait.
1
X-Ray Survey of The ATLAS SCT
2
The ATLAS Semi-Conductor Tracker
3
Alignment Techniques Initial X-Ray Survey Frequency Scanning Interferometry Track-Based Alignment Procedures
4
Aims of The X-Ray Survey Produce a map of the SCT modules Calibrate the FSI system Module positions can be inferred from shape of support structure Provide a starting point for Track Alignment Allows for much faster alignment parameter fixing
5
X-ray Survey Overview
6
The Scanning Head Optical strip reader Linear Motion BM250 Rotary Motion ADR200 X-Ray Assembly
7
R Measurement Ø and Z fixed by scanning head R found through use of stereo angle between X-Ray tubes
8
Linear Motion 8 pole induction motor 25:1 ratio gear box Rubber Wheel Linear Motion BM250 Scanning Head BM250 motor Gear Box Rubber Wheel Rail
9
Optical Strip Reader 1.6m Long Scale Strip RGH25 Read Head RGB25 Signal Processor Maximum Spatial resolution of 5μm Resolution 5μm Signal Period 20μm RGH25 Read Head
10
Laser System Measures translations in X - Y plane and rotations in θ x or θ y Cannot measure translations or rotations about the Z Axis Yet to be installed on scanning head Beam Splitters Laser Beam CCD
11
Tilt Sensors Measure rotations in θ x and Ø Commercial read out electronics exist but still need to be configured Z Axis Scanning Head Tilt Sensors X Axis
12
Software Drivers Labview Drivers manage interface between PC and Motor Controller Interaction with SCT Daq server through ‘baton exchange’ via samba Scan Data stored on SCT Daq server X-Ray Scan Control Software
13
Calibration X-Ray Beam Optical Table SCT Module (In transport case) Z Axis
14
SCT Daq Replica of set up currently used in clean room Hardware + software has been configured and tested Will be used to read out modules during calibration
15
Forward Scan θ SCT Forward Section Z Axis X-Ray Beam Scanning Head No need to vary θ continuously, use 2 or 3 fixed angles and vary Z Simpler and more cost effective Recent simulation indicates improved accuracy
16
Summary Positioning System is now functional Motor and Optical strip reader properly configured Software drivers written Laser and Tilt Systems still to be installed on Scanning Head Currently assembling hardware required for calibration
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.