Presentation is loading. Please wait.

Presentation is loading. Please wait.

1855 Bloor Street Information Session

Similar presentations


Presentation on theme: "1855 Bloor Street Information Session"— Presentation transcript:

1 1855 Bloor Street Information Session
February 18th, 2015

2 Welcome & Introductions
Roly Morris President, Timbercreek Communities Greg Jones Director of Development, First Gulf Chris Fonseca City Councillor, Ward 3, Mississauga Marianne Cassin Manager, Planning Department, Mississauga

3 About Timbercreek Communities
Vision We create better living experiences together. We are a leading owner and operator of multi-family residential communities across Canada. Our people take pride in ownership and an active hands-on approach in how we manage our communities. We are committed to working together collaboratively with our team and community members to create better living experiences.

4 About Timbercreek Communities
Founded in 1999, with a portfolio that consisted of one building in Oakville, Ontario Portfolio has grown to more than 220 buildings with more than 16,000 suites across five provinces throughout 27 cities Part of the Mississauga community since 2005 Currently own and manage four buildings in Mississauga 1855 Bloor will be our first new apartment development

5 About First Gulf Founded in 1987.
Proven market leader in development of mixed-use, office, retail and industrial properties. Commercial arm of the award-winning residential builder, Great Gulf. Extensive experience as third-party contractors, design-builders and construction managers. Key developments include The Globe and Mail Centre, One Bloor, and the new head office for Coca-Cola Canada in Toronto, as well as First Meadowvale Centre in Mississauga.

6 Welcome Your New Neighbour
1855 Bloor 4-storey rental apartment 80 suites offering balconies Indoor & Outdoor Amenity Space 4,800 sq.ft. amenity space with gym and multi-purpose room 4,000 sq.ft. enclosed dog run Access to current outdoor pool for the use and enjoyment of all Residents Bike racks and bike lockers Surface and underground parking Move In Summer 2016

7 Building Green and Accessible
Green building practices LED lighting Water-efficient plumbing fixtures High efficiency boilers Meet Mississauga Stormwater Management Criteria Accessibility for Persons with Disabilities Automatic entrance doors Elevator access to all floors Designated parking spaces Barrier free entrance

8 Enhancing and Respecting the Greenspace
Extensive landscaping New trees, bushes, shrubs and other plants Etobicoke Valley Greenbelt protected, with terraseeding to promote healthy greenspace

9 Minimizing Impact to the Community
Safety The project will be constructed in accordance to the Occupational Health and Safety Regulations for construction sites by the province of Ontario Construction zone is fenced off and all construction activity takes place within the fence Dust/Mud Control We will be diligent to control dust and mud from extending outside the construction zone Noise Construction noise will occur within the hours prescribed by the Mississauga noise by-law Traffic Disruption Minimal planned lane closures on Bridgewood Drive and Bloor Street Temporary parking lot to accommodate parking for Residents Parked vehicles and equipment will be contained within the perimeter fencing whenever possible

10 Thank you for joining us. Any Questions?
For further questions, please contact: Greg Jones Director of Development, First Gulf


Download ppt "1855 Bloor Street Information Session"

Similar presentations


Ads by Google