Aberdeen-Stavanger Gateway. DOF Subsea 2 Welcome Giovanni Corbetta, Managing Director DOF Subsea, part of the DOF Group.

Similar presentations


Presentation on theme: "Aberdeen-Stavanger Gateway. DOF Subsea 2 Welcome Giovanni Corbetta, Managing Director DOF Subsea, part of the DOF Group."— Presentation transcript:

1 Aberdeen-Stavanger Gateway

2 DOF Subsea 2 Welcome Giovanni Corbetta, Managing Director DOF Subsea, part of the DOF Group

3 DOF Subsea 3

4 4 “To be a world class integrated offshore company, delivering marine services and subsea solutions responsibly, without risk, together, every day”

5 5 Steady business Time charter/ROV contracts Long-term contracts DOF Subsea DOF Subsea business model

6 Company Capabilities Integrated Subsea Construction Engineering Flexible & Umbilical Installation Subsea Structure Installation Mooring & Riser Installation Inspection Maintenance & Repair Tie-in & Diverless Intervention Capabilities Field Abandonment & Decommissioning Seabed Mapping Positioning Services DOF Subsea

7 DOF Subsea Atlantic fleet DOF Subsea 7 Skandi SkoltenSkandi Skansen Normand Reach Geosund Skandi Inspector Geoholm

8 DOF Subsea in Aberdeen Moved into Aberdeen in 2006 Opportunities in subsea / marine construction Success to date Followed by a trend of vessel owners moving towards a more projects-based approach DOF Subsea 8

9 Aberdeen – Norway Working together as a region 350 staff working in Atlantic operations People synergies Skills transfer and maximising knowledge Lessons learned DOF Subsea 9

10 Challenges Cultural differences -office culture -business relationships Communication -language barriers -physical distance DOF Subsea 10

11 DOF Subsea Focus regions Global Locations

12 Current projects DOF Subsea

13 Gina Krog FSO Field Development Scope: Installation of TM Buoy Installation of Riser and Riser Base Design, Fabrication and Installation of Spool and Covers Offshore installation May and June 2016 Vessels: Skandi Skolten Normand Reach DOF Subsea 13

14 Maersk Riser Replacement, North Sea Scope: Removal of existing flexible riser system on the Dunbarton field Installation of new riser system Associated surveys Offshore installation will commence July 2014 Vessel: Normand Reach DOF Subsea 14

15 Shell – Corrib Natural Gass Field, Ireland Scope: Disconnecting of the redundant flexible flowlines Install two flexible flowlines Tie-ins of the new flowlines to the wellhead and subsea manifold using the GE Icarus tie- in tool Offshore Installation August 2014 Vessel: Normand Reach DOF Subsea 15

16 Thank you!