1 Concrete and Masonry Construction 29 CFR 1926, Subpart Q

2 General overview of the OSHA regulation  Definitions  General requirements Load placementLoad placement Impalement hazardsImpalement hazards Post-tensioning operationsPost-tensioning operations Concrete bucketsConcrete buckets  Hazards of working with concrete 1a

3 Equipment and Tools  Bulk cement storage Lockout/TagoutLockout/Tagout  Concrete mixers  Power concrete trowels  Concrete buggies 2a

4 Equipment and Tools  Concrete pumping systems  Tremies  Bull floats  Masonry Saws 2b

5 Cast-in-place concrete requirements  General requirements for formwork Support without failureSupport without failure Drawings and plansDrawings and plans 3a

6 Cast-in-place concrete requirements  Shoring and reshoring Inspection of equipmentInspection of equipment Damaged equipment strength requirementDamaged equipment strength requirement Inspection of erected equipmentInspection of erected equipment 3b

7 Cast-in-place concrete requirements  Shoring and reshoring Strength requirements after erectionStrength requirements after erection Firm contact and securityFirm contact and security Eccentric loadsEccentric loads Tiered single post shoresTiered single post shores Reshoring requirementsReshoring requirements 3c

8 Cast-in-place concrete requirements  Vertical slip forms Rods and pipesRods and pipes Form designForm design Scaffold workScaffold work 3d

9 Cast-in-place concrete requirements  Vertical slip forms Jacks, vertical support, and rated capacityJacks, vertical support, and rated capacity Holding devicesHolding devices Form structureForm structure Rate of liftRate of lift 3e

10 Cast-in-place concrete requirements  Reinforcing steel Rebar supportRebar support Rolled wire meshRolled wire mesh 3f

11 Cast-in-place concrete requirements  Formwork removal Conditions for removalConditions for removal Reshoring removalReshoring removal 3g

12 Precast concrete  Adequate support  Lifting inserts  Employee safety 4a

13 Lift-slab Operations  Professional design and plan Detailed instructions and sketchesDetailed instructions and sketches Lateral stabilityLateral stability 5a

14 Lift-slab Operations  Jacking equipment Load and overloadLoad and overload Equipment includesEquipment includes  Protection of employees 5b

15 Masonry construction requirements  Limited access zone requirements DimensionsDimensions PlacementPlacement Restricted areaRestricted area Requirements for removingRequirements for removing 6a