P10457: D-R Process Improvement Compressor Assembly Area ----------- Patrick Muldoon Introductions and Welcoming Comments.

Similar presentations


Presentation on theme: "P10457: D-R Process Improvement Compressor Assembly Area ----------- Patrick Muldoon Introductions and Welcoming Comments."— Presentation transcript:

1 P10457: D-R Process Improvement Compressor Assembly Area ----------- Patrick Muldoon
Introductions and Welcoming Comments

2 “Dresser-Rand is positioned to deliver a complete package of solutions, from initial concept to equipment retirement for the worldwide oil and gas, chemical, petrochemical, and process industries.” Lean Manufacturing ~ More Value With Less Work

3 Project Objective Process Improvement on a critical assembly area within Dresser-Rand Corporation. Goal: Reduce cycle time of the Compressor Assembly Area. Create safe & operational work areas. Improve flow // Eliminate problem areas. Lean Manufacturing ~ More Value With Less Work

4 Connection to Past MSD Projects
P08455 – Value Engineering in a Manufacturing Facility Compressor Final Internal Assembly Stand P09457 – Process Improvement Project Piping and Packaging Line From P08455 Final Drawing Package Photo taken by P09457 Lean Manufacturing ~ More Value With Less Work

5 Interest Areas Lean Techniques Simulation // Modeling Custom Tooling
Plant Layout // Factory Analysis Cost Reduction Inventory Management Lean Manufacturing ~ More Value With Less Work

6 What to Expect A stimulating 22 week project.
Hands-on work in a factory setting. Direct interaction with customer. Lean Manufacturing ~ More Value With Less Work

7 Possible Opportunities & Outcomes
Work together with employees in a multi-billion dollar corporation. Potential career opportunities. First hand experience in the development of lean manufacturing. Tooling design and execution. Lean Manufacturing ~ More Value With Less Work

8 MSD - P10457 Enroll now! This offer won’t last long!
Lean Manufacturing ~ More Value With Less Work