Presentation is loading. Please wait.

Presentation is loading. Please wait.

AAE450 Spring 2009. Xpedition AAE450 Spring 2009 Deliverables due Friday Midnight: 1.Main Body content Don’t want detailed information (mass of shear.

Similar presentations


Presentation on theme: "AAE450 Spring 2009. Xpedition AAE450 Spring 2009 Deliverables due Friday Midnight: 1.Main Body content Don’t want detailed information (mass of shear."— Presentation transcript:

1 AAE450 Spring 2009

2 Xpedition

3 AAE450 Spring 2009 Deliverables due Friday Midnight: 1.Main Body content Don’t want detailed information (mass of shear panel, etc) Give the reader what they need to know to understand the system, don’t try to overload them! 2.Appendix content One-to-one correspondence with main body content, each section could be very short or very long Make each appendix section independent of one another, just reference other sections in appendix 3.List of references in AIAA format 4.Commented code (make sure filename is descriptive) 5.List of acronyms used in all your sections 6.“About the Authors” paragraph 7.Up to 10 index listings you feel are important to your section


Download ppt "AAE450 Spring 2009. Xpedition AAE450 Spring 2009 Deliverables due Friday Midnight: 1.Main Body content Don’t want detailed information (mass of shear."

Similar presentations


Ads by Google