UVIC cloud chamber DEC,10 2008 Mechanical questions Reply to: Mark Lenckowski General drawing notes: * Red tubing – discharge * Purple tube.

Similar presentations


Presentation on theme: "UVIC cloud chamber DEC,10 2008 Mechanical questions Reply to: Mark Lenckowski General drawing notes: * Red tubing – discharge * Purple tube."— Presentation transcript:

1 UVIC cloud chamber DEC,10 2008 Mechanical questions Reply to: Mark Lenckowski kram@uvic.ca General drawing notes: * Red tubing – discharge * Purple tube – suction and/or evaporator * Yellow tube – oil line to compressor * Orange tube – discharge (separator to heat exchanger) * Hi temp stage – R134A (approx 10oz) * Low temp stage – R508 (approx 100-120PSIG) * All access ports will have caps (not drawn)

2 Cloud chamber mechanical (iso) Cold stage evaporator

3 Cloud chamber mechanical (front) Heat exchanger Cold stage refrigeration Approx 32” Warm stage refrigeration

4 Cloud chamber mechanical (left) Access ports Cold stage Access ports Warm stage

5 Warm stage circuit (iso)

6 Warm stage circuit (front) DISCHARGE: (red) ¼” tube X 52” long Q3: is two loops sufficient for vibration control? SUCTION: (purple) 3/8” tube X 92” long Q1: is two loops OK for vibration control? Q2: is 5/16” tube an option?

7 Warm stage circuit (left) Schrader access valve SAE ¼” flare (discharge side) Q4: Is this style of valve OK on the discharge circuit? Shut-off/access valve (packed) with SAE 3/8” flare port. Henry 7763-B valve or equivalent. Q7: Is this an acceptable style of valve? Q8: Is this location acceptable?.042” capillary tube 90” long This feature is copied from pictures of Scientemp equipment. Q5: Is it an expansion chamber or Filter dryer? Q6: If a filter dryer, is 100 mesh size to be used? Filter dryer to keep capillary tube clear (drawn as 1” X 6” size) Q9: Is 100 mesh size good to use? Q10: Is the size (volume) acceptable Q11: does filter dryer need to be vertical or is about 30deg OK?

8 Warm stage circuit (right)

9 Cold stage circuit (iso) Evaporator cold stage * 5/16” tube X 230”long * 22” OD X 2” pitch spiral coil Q12: Is 3/8” tube too big?

10 Cold stage circuit (front) Evaporator cold stage 5/16” tube Suction: 3/8” tube X 69” long Discharge: ¼” tube X 35” long Q14: is two full loops OK for vibration control? Suction: Q13: is two loops OK for vibration control? Oil return: ¼” tube X 23” long Discharge: ¼” X 16” long

11 Cold stage circuit (left) Schrader access valve SAE ¼” flare (discharge side) Q18: Is this style of valve OK on the discharge circuit? Capillary tube:.036” X 90” long Shut-off/access valve (packed) with SAE 3/8” flare port. Henry 7763-B valve or equivalent. Q19: Is this an acceptable style of valve? Q20: Is this location acceptable? Filter dryer (drawn as 1” X 6” size) Q15: Is 100 mesh size good to use here? Q16: Is the size (volume) acceptable? Q17: does filter dryer need to be vertical or is about 30deg OK?

12 Cold stage circuit (right)


Download ppt "UVIC cloud chamber DEC,10 2008 Mechanical questions Reply to: Mark Lenckowski General drawing notes: * Red tubing – discharge * Purple tube."