Download presentation
Presentation is loading. Please wait.
Published byGervais Golden Modified over 9 years ago
1
May 25, 2015Board of Trustees Meeting Vision: The Neurosciences Research Building is a continuation of the School of Medicine and Indiana University's focus on expanding and strengthening the biomedical and life sciences research capability of the university.
2
May 25, 2015Board of Trustees Meeting Context
3
May 25, 2015Board of Trustees Meeting Site Plan
4
May 25, 2015Board of Trustees Meeting Enlarged Site Plan
5
Aerial View May 25, 2015Board of Trustees Meeting Proposed Clinic Clarian People Mover Existing Garage Proposed Clarian Garage Methodist Hospital IU Research 15 th Street 16 th Street Missouri St I-65
6
May 25, 2015 People Mover View Board of Trustees Meeting
7
May 25, 2015 People Mover View Board of Trustees Meeting
8
May 25, 2015 Ground Level View Board of Trustees Meeting
9
May 25, 2015 Ground Level View Board of Trustees Meeting
10
Building Section May 25, 2015Board of Trustees Meeting Building Concepts: Layered N/S Plan and Section Vertical Integration of Lab Support Functions Modular Design (Lab, Support, Office) Behavior Lab Module Stacked
11
May 25, 2015 First Floor Plan Board of Trustees Meeting Research BuildingClinic
12
May 25, 2015 Second Floor Plan Board of Trustees Meeting ClinicResearch Building
13
May 25, 2015 Third, Fourth, Fifth Floor Plan Board of Trustees Meeting ClinicResearch Building
14
Phase 2 Diagram May 25, 2015Board of Trustees Meeting
15
Phase 2 Image May 25, 2015Board of Trustees Meeting Phase 2
16
May 25, 2015 South Elevation Board of Trustees Meeting Precast Concrete A Research BuildingClinic Precast Concrete B Fritted Glass A & B Metal Panel A Clear Glass Metal Panel B
17
Fritted Glass A & B Precast Concrete B Fritted Glass A & B Metal Panel A May 25, 2015 East Elevation Board of Trustees Meeting Precast Concrete B Precast Concrete A Clear Glass
18
Fritted Glass C Research Building Clinic Precast Concrete B Metal Panel B Clear Glass May 25, 2015 North Elevation Board of Trustees Meeting Precast Concrete A Metal Panel A
19
Interior View May 25, 2015Board of Trustees Meeting
20
Sustainability May 25, 2015Board of Trustees Meeting LEED Mission: A leading edge system for certifying the greenest performing buildings in the world.
21
1. Sustainable Sites Urban site previously developed 2. Efficient use of Water 35% water use reduction 3. Energy and Atmosphere Heat Recovery wheel Sustainability May 25, 2015Board of Trustees Meeting 4. Materials and Resources Divert 50% of construction waste from disposal 5. Indoor Environmental Quality Provide occupant controls for airflow, temperature and lighting 6. Innovative Design Paperless Construction Administration Process Project Goal: LEED Silver
22
Schedule May 25, 2015Board of Trustees Meeting End of Design Development: December 10 th, 2010 IU Review Comments due: December 23 rd, 2010 End of Construction Documents:March 31 st, 2011 IU Review Comments due :April 8 th, 2011 Bidding: April 8 th 2011 – May 5 th 2011 Construction: June 6 th 2011-July 11 th 2013 Commissioning:July 11 th 2013-Sept. 11 th 2013 Close-out:Sept.11 th 2013-Nov. 11 th 2013 Occupied:January 2014
23
May 25, 2015 Aerial View Looking Northwest Board of Trustees Meeting
24
May 25, 2015 View from 16 th Street Board of Trustees Meeting
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.