2
Restore Iraqi Oil
3
A Chronology and Highlights of Boots & Coots in Iraq A Real Kick
4
Iraq “The Cradle of Civilization”
5
Iraq – 24 Million People Texas has 21 Million PeopleSize of California
6
What Ancient Iraq Gave Humanity Grain Agriculture First writings of Ag techniques Land Cultivation Double Entry Accounting The Wheel and the Plow Math system based on 60 (seconds & minutes) Banking
7
Iraq’s accomplishments cont. 1 st Written Alphabet Noah & the Garden of Eden Eye for an Eye, a tooth for a tooth legal system 360 deg in a circle The Zero The Arabic number system (although we use different symbols than original) [٠١٢٣٤٥٦٧٨٩]
8
Boots & Coots Involvement in the Iraqi Conflict Background During 1991 Gulf War - B&C was one of the lead Firefighting Companies. Others Red Adair & Wild Well Control. After retirement of Coots, Boots & Red => The 1997 merger of B&C with Red Adair’s employees
9
Boots & Coots Involvement in the RIO Project Background There are over 2,000 oil wells in Iraq. 1991 Gulf War – Hussein sabotaged 849 wells. Of those, 732 required blowout intervention.
10
Boots & Coots Involvement in the RIO Project Planning Assignment: Position equipment & personnel to respond to sabotage well fires and be there to help restore production. respond to sabotage well fires and be there to help restore production. Developed a scenario for oil well sabotage Best Case ~40 wells on fire Worst Case ~1,414 wells on fire Most Probable Case ~464 wells on fire
11
Boots & Coots Involvement in the RIO Project Preparation Finalized blowout contingency plan October 2002, signed contracts. Mobilized to Kuwait City in January and February 2003. Helped train 12 military teams charged with securing oilfield infrastructure in the South. Procured and expedited equipment.
12
Boots & Coots Involvement in the RIO Project Equipment 4 complete fire fighting packages 12 capping wellhead assemblies 2 sets of oil well testing equipment Misc. wellhead repair equipment & valves
13
March 2003 Boots & Coots 12 men on stand-by in Kuwait City Staged and Prepared Equipment Consulted Directly with Military
14
Staged Equipment
15
Preparation for War We’re Good To Go!
16
March 20, 2003 War Begins Air strikes commence Hussein orders sabotage of wells
17
Scud Alerts were Everyday @ first of War & several times a day Lightning!
18
At…Camp Arifjan Vaccinations for Anthrax & Small Pox Issued NBC (Nuclear, Biological & Chemical) Gear and Gas Mask. Must have on person 24 hrs/day
19
The Fires Four wells were ignited, and twelve others were badly damaged. Sabotage was attempted on several hundred wells.
20
Firefighting Becomes a Priority
21
Supply Route Through Oil Field US convoy moving through oilfield toward Baghdad
22
Welcome to Iraq
23
Dallas Breach – 1 of 3 Roads across DMZ from Kuwait to Baghdad Flak Jackets are in Fashion Texas Influence
24
Dallas Breach
25
25 feet 18 feet Miles… Hussein's Ditch Immediately across DMZ on Iraqi soil is: The plan was to fill with oil & burn
26
Initial Site Survey
27
US Gunship – on patrol
28
Satellite Image of Well fires Iraq Kuwait You would be here Iran Dallas Breach
29
EOD Staff Explosive Ordinance Disarmament First - Sweep area for Mines
30
Security & EOD Personnel
31
Mine Fields Everywhere Anti-Personnel Mines
32
…and Dangerous
33
Cluster Munitions This was fresh but we found stuff from 1991 still around
34
Iraqi Munitions – RPGs
35
Locals Impacted
36
On Way to inspect damage
39
Sabotaged Well Head Explosive Charge Detonated without Damage
40
Bomb Placement C4 and sandbags placed between 71/6’’ valve and 11’’ flange Detonation by remote and via phone lines Secondary incendiary device used to ignite well
41
Perimeter Security
42
Logistics Challenge
43
Kuwait Wild Well Killers Aisa Bou Yabes (KOC) Team Leader KWWK KWWK Controls 1 st Fire In Iraq
45
Well Control Operations An Awesome Place to Work
46
Well Kill Operations…
47
B&C’s first well: 4 days from start to finish
50
Oil Spill Clean Up Required
51
Well Kill Inspection
52
Dirty Worker - Mike Foreman
53
Bullheading Stinging
54
Close-up view of Stinger Mud Pumped at high pressure through nozzle into well & bullhead fluid to reservoir to stop flow Oil Blowout Stinger
57
Well #2 Site Preparation: Water is #1 Priority
58
A Water Pit and Pipeline are required on 2 nd Well to satisfy the 1.2 Million gallon water appetite
59
This well is burning ~USD$1 Million per day!
61
The Fire Fight !
63
Going……
64
Going…….
65
Going…….
67
Gone !!!
68
Flashback Ignites The superheated ground and fumes mix.
69
Flashback
71
The fire is extinguished.
72
Sabotaged Well Severed 7-1/16”–5M wing flange
73
Stinging operation on 2 nd well Pumping on both the tubing and the casing
74
The Boots & Coots Team
76
THE END