Watercycle 3 rd Transnational Meeting Koprivnica, January 16th 2008 Watercycle 3 rd Transnational Meeting Koprivnica, January 16th 2008.

Similar presentations


Presentation on theme: "Watercycle 3 rd Transnational Meeting Koprivnica, January 16th 2008 Watercycle 3 rd Transnational Meeting Koprivnica, January 16th 2008."— Presentation transcript:

1 Watercycle 3 rd Transnational Meeting Koprivnica, January 16th 2008 Watercycle 3 rd Transnational Meeting Koprivnica, January 16th 2008

2 Town of Velika Gorica Main activity of partner on the project Watercycle: Working out the environmental impact study for the reconstruction of the municipal waste-water treatment plant of Velika Gorica Main activity of partner on the project Watercycle: Working out the environmental impact study for the reconstruction of the municipal waste-water treatment plant of Velika Gorica Environmental impact study is an obligation in the process of acquiring the site-permit for the reconstruction. It shall propose measures for environment protection during the building phase and working lifetime of the waste-water treatment plant.

3 Why the reconstruction of the waste-water treatment plant is needed: The plant is designed for a total of cca 30.000 inhabitants, while today Town of Velika Gorica counts over 70.000.The plant is designed for a total of cca 30.000 inhabitants, while today Town of Velika Gorica counts over 70.000. The plant should have been built in phases, but some of the phases have never been finished.The plant should have been built in phases, but some of the phases have never been finished. The plant is designed for a total of cca 30.000 inhabitants, while today Town of Velika Gorica counts over 70.000.The plant is designed for a total of cca 30.000 inhabitants, while today Town of Velika Gorica counts over 70.000. The plant should have been built in phases, but some of the phases have never been finished.The plant should have been built in phases, but some of the phases have never been finished.

4 Why the reconstruction of the waste-water treatment plant is needed: The residual sludge is usually dumped on a nearby meadow, which gradually became a marsh, because the equipment for sludge treatment was never installedThe residual sludge is usually dumped on a nearby meadow, which gradually became a marsh, because the equipment for sludge treatment was never installed

5 Some parts of the plant have never been finished or started working...Some parts of the plant have never been finished or started working... Why the reconstruction of the waste-water treatment plant is needed:

6 … while the others, due to ageing and limited maintenance, became useless.… while the others, due to ageing and limited maintenance, became useless. Why the reconstruction of the waste-water treatment plant is needed:

7 Working out an environmental impact study for the reconstruction of municipal waste-water treatment plant of Velika Gorica is the first step towards the solution of many long-term problems in plant’s management. Taking into account that one of the most important natural resources in the area occupied by the Town of Velika Gorica is a large underground drinking water basin, this should be the way towards ensuring its long-term protection. Working out an environmental impact study for the reconstruction of municipal waste-water treatment plant of Velika Gorica is the first step towards the solution of many long-term problems in plant’s management. Taking into account that one of the most important natural resources in the area occupied by the Town of Velika Gorica is a large underground drinking water basin, this should be the way towards ensuring its long-term protection.

8 Current state of progress: collecting documentation needed for the environmental impact study – existing technical documentation acquired and copied working out the documentation for the bidding, terms of reference – in progress solving the problem of resignation of the project supervisor for Town of Velika Gorica – consultations needed with contracting authoritiy Current state of progress: collecting documentation needed for the environmental impact study – existing technical documentation acquired and copied working out the documentation for the bidding, terms of reference – in progress solving the problem of resignation of the project supervisor for Town of Velika Gorica – consultations needed with contracting authoritiy