Steve Slater “DDP” – Requirements 13 th Feb 2014.

Similar presentations


Presentation on theme: "Steve Slater “DDP” – Requirements 13 th Feb 2014."— Presentation transcript:

1 Steve Slater “DDP” – Requirements 13 th Feb 2014

2 2 DFA2 Moving to DDP Characteristics observed in DFA 2 Positives Strong safety culture Developing relationships. Good understanding of SL’s requirements. Negatives Project controls and delivery of simple data to correct quality and on time –Schedules, EAC and monthly reports Robust predictable delivery. Understanding of SL management systems and permissioning arrangements. Quality control – ‘right first time’, design and fabrication.

3 Lower Tier Suppliers Main Contractors / Consortia (DFA2 model) 3 Structure Operating Units 12345 Broad base capability support

4 4 Structure Operating Units Main Contractors / Consortia (DFA2 model) 12453 5 SL and DFA integrated teams Fully integrated delivery

5 5 Characteristics Operating Units Main Contractors / Consortia (DFA2 model) 12453 Main Contractors / Consortia Utilising the same approach as the DFA2 model, larger Tier 2 companies or consortia capable of providing a full cradle-to-grave service with suitable sub-contractors 4-6 companies to provide wider competition and capability Larger contracts will be placed via this route – this is the backbone/workhorse for DDP Based on a 5+5 to create long-term behaviours and to allow for re-competing/continuity at contract end Genuinely integrated teams with SL & DDP contractors – reduce the ‘man marking’.

6 Small Enterprise Suppliers 6 Structure Operating Units Demolition Optioneering Design Remote handling Characterisation Technical Temporary Works Broad base capability support

7 7 Characteristics Operating Units Small Enterprise Suppliers Demolition Optioneering Design Remote handling Characterisation Technical Temporary Works Small Enterprise Suppliers Aimed at smaller suppliers Main purpose is to provide a highly responsive set of capabilities that enable SL to have direct access to lower tiers of supply chain Contribute to early small value responsive requests Lower value contracts to be placed directly based on best athlete (competition demonstrated at DDP tender level) Likely to have a limit on individual contract awards (£100k) and a cumulative ceiling on this lot (£2,000k per annum)

8 Main Contractors / Consortia (DFA2 model) 8 Structure Operating Units 12345 Small Enterprise Suppliers Demolition Optioneering Design Remote handling Characterisation Technical Temporary Works We will encourage collaborative working No reason why SME’s cannot be part of main consortia

9 9 Future First part of a longer term relationship Develop strength in depth: –Opportunities to ‘up-skill’ the supply chain via integrated working, a shared risk approach. Develop breadth of supply chain: –SME and new entrants to SL. Studies and active demonstrators to commence in support of broad front decommissioning: TEXT REMOVED FOR UPLOAD ON TO WEBSITE SL is approaching broad front decommissioning –THORP and Magnox post operational clean out and decommissioning will start second term of contract.

10 10 DFA2 Moving to DDP – Characteristics required More open access to SL Lifetime Plans through integration of teams Open trusting relationship –Say what you are going to do –Say what you are not going to do –Delivery what you said you would –Don’t delivery what you do not need to do Quality product delivered to schedule and cost. Commercially neutral –Not compensation event aggressive nor passive - open

11 Disclaimer Important Information This communication and its contents have been provided to you for informational purposes only. This communication is not advice on or a recommendation of any kind with respect to the matters described herein, including without limitation, contracting structures, contracting instruments, contracting strategies, related legal and commercial issues or any combination of such matters. This communication does not offer advice. No information contained herein constitutes an offer or solicitation by or on behalf of Sellafield Ltd to enter into any contractual arrangement. Sellafield Ltd. makes no representations or warranties, express or implied, regarding the accuracy, adequacy, reasonableness or completeness of the information, assumptions or analysis contained herein or in any supplemental materials, and Sellafield Ltd. accepts no responsibility or liability in connection therewith. Opinions expressed in this presentation are subject to change without notice.