Presentation is loading. Please wait.

Presentation is loading. Please wait.

Networking Issues David Salmon UKERNA/GNT

Similar presentations


Presentation on theme: "Networking Issues David Salmon UKERNA/GNT"— Presentation transcript:

1 Networking Issues David Salmon UKERNA/GNT D.Salmon@ukerna.ac.uk

2 7 February 2003NeSC visit2 AbMan ClydeNetEastMAN UHI YHMAN NORMAN Thames Valley South Wales SWERN LeNSE Kentish MAN LMN EMMAN EastNET LINX GEANT & USA NNW N.I. MAN MidMAN C&NL MAN North Wales SuperJANET4 architecture GlasgowEdinburgh Warrington Leeds Reading London Bristol Portsmouth

3 7 February 2003NeSC visit3 Implementation backbone linking C-PoPs access links to regional networks (MANs)

4 7 February 2003NeSC visit4 C-PoPs and BARs SDH ADM MAN Cisco 12008 or 12016 SDH ADM Backbone Access Link Cisco 12016 C-PoPBAR

5 7 February 2003NeSC visit5 WarringtonLeeds London Reading SJ4 Development Network 2.5 Gbps Manchester (DL) RAL UCL MB-NG ULCC

6 7 February 2003NeSC visit6 Bandwidth in the backbone requirements for 2003-2005? discussions within JCN 155 Mbps 2.5 Gbps 10 + (10) Gbps 1999 200120022003

7 7 February 2003NeSC visit7 JANET’s External connections Global access 2 (3) * 2.5Gbps UK based transit to Global Internet – commodity traffic Bandwidth to Europe GÉANT — 2.5 Gbps Transatlantic bandwidth Recent history of Telco failures… Dedicated circuit gone now have transit via GÉANT

8 7 February 2003NeSC visit8 JANET’s External connections

9 7 February 2003NeSC visit9 GEANT Abilene national backbone regional network University LAN Dept. individual user NATIONAL REGION INSTITUTION Bandwidth delivery chain

10 7 February 2003NeSC visit10 High bandwidth connections BAR C-PoP MAN Research Group charging: marginal costs (HE & Research only) E.g. Edinburgh & Glasgow connection for ScotGRID

11 7 February 2003NeSC visit11 Intended for Industrial project partners UKERNA paper approved by JCN Policy for connection charges JANET connection costs Infrastructure – full cost Telecom link: installation & rental Routers/Switches & interfaces Access to JANET Contribution to JANET infrastructure ‘List’ prices up to 34Mb/s E-Science project connection costs

12 7 February 2003NeSC visit12 C-PoP Options BAR MAN Research Group Pilot at Reading C-PoP Develop procedures & cost model Other selected C-PoPs later – (Leeds…) Backbone Router C-PoP Switch UKERNA Content Host 3 rd Party Equipment C-PoP

13 7 February 2003NeSC visit13 Issues to think about Project requirements nature of traffic – volume, rate, real-time ? Implications for department/university LANs involve local support staff Regional connection: RN or direct ? discuss requirements with local RN operator Dedicated connection to industrial partners OK for collaborative work under JANET AUP Need for access to development network ? Funding sources for above

14 7 February 2003NeSC visit14 GNT Applications Questionnaire Assess e-Science applications Network Requirements Network Impact Main points Application architecture Identify & Characterise the most-significant traffic-flows Scalability – more users, more sites… Process GNT & GSC Member/s visit projects Assist project to answer points above

15 7 February 2003NeSC visit15 JANET Multicast Multicast to all RNs UKERNA Project plan Regional Networks survey Equipment & Topology 60-70% of RNs now “Multicast capable” i.e. – could deliver to sites if they request it Encouraging the rest to follow suit Documentation JANET Multicast Guide Operational Monitoring Beacons Eventual incorporation into production SLAs


Download ppt "Networking Issues David Salmon UKERNA/GNT"

Similar presentations


Ads by Google