Download presentation
Presentation is loading. Please wait.
Published byAdele Parker Modified over 9 years ago
1
Engineering Solutions Event Six students will design a solution to an engineering problem. Students will work as a team to design solutions. Teams will be receive a set of construction materials and pricing charts. There are potentially multiple solutions to the problem.
2
University City is currently home to a number of new construction projects.
15
Engineering Solutions Event Goal: Build a hotel that yields the highest profit.
16
Engineering Solutions Event Goal: Build a hotel that yields the highest profit. Each cube represents a hotel room. All 50 cubes must be used.
17
Engineering Solutions Event Goal: Build a hotel that yields the highest profit. Entire hotel must be connected as one piece.
18
Engineering Solutions Event Goal: Build a hotel that yields the highest profit. Entire hotel must be connected as one piece.
19
Engineering Solutions Event Goal: Build a hotel that yields the highest profit. Entire hotel must be connected as one piece.
20
Engineering Solutions Event Goal: Build a hotel that yields the highest profit. All rooms must have at least one window. (A window is any exposed vertical side of cube.)
21
Engineering Solutions Event Goal: Build a hotel that yields the highest profit. All rooms must have at least one window. (A window is any exposed vertical side of cube.)
22
Engineering Solutions Event Goal: Build a hotel that yields the highest profit. All rooms must have at least one window. (A window is any exposed vertical side of cube.)
23
Engineering Solutions Event Goal: Build a hotel that yields the highest profit. COSTS Land costs $400 per square unit. Land refers to outline of top view of building.
24
Engineering Solutions Event Goal: Build a hotel that yields the highest profit. COSTS Land costs $400 per square unit. Land refers to outline of top view of building. 18
25
Engineering Solutions Event Goal: Build a hotel that yields the highest profit. COSTS Land costs $400 per square unit. Land refers to outline of top view of building. 18 15
26
Engineering Solutions Event Goal: Build a hotel that yields the highest profit. COSTS Land costs $400 per square unit. Land refers to outline of top view of building. 18 15
27
Engineering Solutions Event Goal: Build a hotel that yields the highest profit. COSTS A roof costs $10 each. ( A roof is any exposed top side of cube.) A window costs $5 each.
28
Engineering Solutions Event Goal: Build a hotel that yields the highest profit. COSTS Taxes will be collected based on building height. Floors 1-10 —> 50% x land cost Floors 11-20 —> 1000% x land cost Floors 21-30 —> 2000% Floors 31-40 —> 3000% Floors 41-50 —> 5000%
29
Engineering Solutions Event Goal: Build a hotel that yields the highest profit. INCOME 4 windows, 1 roof = $600 4 windows, 0 roof = $500 3 windows, 1 roof = $300 3 windows, 0 roof = $250 2 windows, 1 roof = $200 2 windows, 0 roof = $175 1 window, 1 roof = $150 1 window, 0 roof = $125
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.