Vaiont Dam Matt Hanson (4002290) Chris Nicholson (4004603)

Similar presentations


Presentation on theme: "Vaiont Dam Matt Hanson (4002290) Chris Nicholson (4004603)"— Presentation transcript:

1 Vaiont Dam Matt Hanson (4002290) Chris Nicholson (4004603)

2 INTRODUCTION One of the Largest Dams in the World Completed in 1961 Cupola dam 266m high Lies on the Vaiont River Generates Hydro-Electric Power Stored Water spilt over the Dam

3 GEOLOGY Geological Structure – Syncline Sedimentary Rocks – Shale and Limestone Slip Surface along Weak Bedding Planes Reservoir Filled Old Slip Surface Began to Move

4 GEOLOGY

5 WHAT HAPPENED

6 ENGINEERING APPROACHES Groundwater Pressures – increase drainage Geology Consulting – saturated clay layer Slip Surface Engineer’s Error

7 SOLUTIONS ADOPTED Feb 1960 - 1 st filling of Reservoir – varying level of water Oct 1961 - 2 nd filling – surface movement rates increased April 1963 - 3 rd filling – movement rates increased further Sept 1963, water levels dropped to bring creep under control October 9 th – catastrophic failure

8 CONCLUSION Reservoir Inappropriate for Area Engineers Incompetence Major Disaster for Civil Engineering Highlighted the importance of Geological Surveys