Presentation is loading. Please wait.

Presentation is loading. Please wait.

Sabah Oil and Gas Conference 2014

Similar presentations


Presentation on theme: "Sabah Oil and Gas Conference 2014"— Presentation transcript:

1 Sabah Oil and Gas Conference 2014
Talisman Malaysia Increasing Growth Opportunities for Sabah May 26th, 2014

2 Content Overview of Talisman Energy Sabah Growth Strategy
Securing a Foundation Maximising Asset Recovery Expanding through Exploration Working with other Operators

3 Talisman Energy Global Operations Two Core Regions : The Americas and Asia-Pacific
Core: Asia-Pacific Generating free cash flow, near-term exploration potential Long life assets with high netbacks Core: Americas Resource plays provide long-term growth Colombia – exploration and development underway Other areas – considering all options UK – Sinopec deal lowers exposure Norway – sales process underway Kurdistan – Kurdamir and Topkhana appraisal ongoing 2014 production guidance mboe/d Core areas mboe/d Other mboe/d 2013 2P reserves ~1640 mmboe Core areas ~1480 mmboe Other ~160 mmboe

4 Talisman Energy - Asia Pacific A Core Talisman Region
Vietnam HST/HSD Vietnam Nam Con Son Malay Basin Sabah Basin Tangguh South Sumatra Papua New Guinea Kitan/LamCor Core areas Additional Assets Exploration 500 1,000 1,500 Km

5 Talisman Energy in Malaysia Assets Overview
TLM block Oil field Gas field Vietnam Malaysia SB309 & SB310 (70% WI) Gross exploration acreage 13,000 km2 3-4 well exploration program planned in 2014 PM-3 CAA (41% WI) Unique cross-border development Supplying gas to two nations Talisman’s largest operated asset Finalizing PSC extension Kinabalu (60% WI) Operated effective 26 Dec 2012 Successful completion of 3 infill wells Commencing redevelopment Sabah PM305 & PM314 (60% WI) SAA – about 85% recovery to date Studying options to extend field life Peninsular Malaysia Sarawak

6 Sabah New Core Area anchored by Kinabalu
Kinabalu is a secure base with upside recovery opportunities Significant acreage in a prolific and proven hydrocarbon province Extensive infrastructure enhances exploration monetization opportunities for oil and gas Potential Synergies with other operators to optimise operation and Development Plans Near Term Kinabalu Transfer of Operatorship Future Growth Exploration Success 6

7 2012 Kinabalu Oil PSC Overview
Kinabalu – Location Map Kinabalu – Block Details Block: SB1 Kinabalu 2012 Kinabalu Oil PSC: Start Date: Dec 2012 (20 years license) Operator: TLM (60%) Partner: PETRONAS Carigali (40%) Location 55 km NW of Labuan 28 km SW of Samarang 2 km SE of KNAG Field Water Depth: 56 m Discovery: 1989 and First Oil: Dec 1997 Cum. Oil = 97 MMstb 20 Development Wells (20 active strings) Samarang Complex (PCSB*) KNAG (PCSB) Kinabalu KNDP-A Labuan LCOT (SHELL) First PSC handover to International Operator First progressive volume PSC to encourage brownfield redevelopment First infill well : 9 months following transfer of operatorship Redevelopment project, Concept Selection : 10 months following transfer of operatorship

8 2012 Kinabalu Oil PSC Growth Strategy
Production Operations Early Rejuvenation Redevelopment South Sabah Growth & Synergies Improve the HSE Performance Improve Field Reliability Existing Platform Debottlenecking Project to be completed in Q Well interventions Six Infill wells approved Double Field Production within one year New Platform New Facilities Additional Infill Drilling Secondary Oil Recovery Exploration Success Potential Synergies with PETRONAS Carigali in Sabah LP Separator KN 114st Within Talisman Corporate Responsibility Standards

9 Managing Aging Infrastructure It starts at the beginning
Management of Change Training & Competency DESIGN CONSTRUCT INSPECT EMERGENCY RESPONSE IDENTIFY HAZARDS OPERATE MAINTAIN Cessation of Production Operations Decommission VERIFY Helideck Lighting Installation Crane serviced and recertified for man-riding Additional Escape Route

10 Facilities Debottlenecking Ready for Future Growth
Initial Infill Drilling programme and well interventions increasing fluids throughput Restrictions in liquid export rates Preparation for additional offtake rates once the full field redevelopment project is implemented Liquid Production Increase Remove produced water prior to export Convert LP Separator to 3 Phases Equipment Integrity Improvement Install Online Sand Removal System Gas Production Increase Modify LP Compressor to increase its capacity to minimize flaring.

11 Field Rejuvenation Maximising use of Existing Slots
Well 6 Well 1 Well 2 Well 4 Well 3 Well 5 # 4 # 3 # 5 # 1 # 6 # 2 East Fault Block Main Fault Block Note: All Wells Are Projected

12 Field Rejuvenation Drilling Performance to date
No Recordable Incidents (LTI, RWI, MTI) Excellent operational performance - benefit of established Rig Contractor (20+ years in Malaysia) Continuity of activity in Sabah – Key to Performance

13 Kinabalu Redevelopment Maximising Recovery Factor
A Team Approach : Project Success is driven by the Integration of all Disciplines Consider Novel ‘Cost/Schedule Saving’ Schemes ‘No Stone Unturned’

14 Kinabalu Redevelopment Selected Concept Overview
Two Stage Development Secondary Recovery Implementation Increase field recovery factor to ~ 40% Stage 1 (Early Production) Stage 2 (Full Production) Scope Installation of a 20 slot wellhead platform (WHP) bridge linked to KNDP-A. Maximum Use of Existing KNDP-A Installation of a new CPP bridge linked to the new WHP Gas Compression & Water Injection Estimated 1st Oil 4Q 2016 4Q 2017 (Estimated 1st Injection) New Well Head Platform

15 Exploration Portfolio
SB310 & SB309 Prospects and Leads Partners: TML (70%), PCSB (30%) PSC Signed; Effective Date - 26th October 2009 Exploration period: 6 years 5 Commitment wells in SB310; 3 wells in SB309

16 Operational Integration
South Sabah Synergies A way of working between Operators KNNAG / Kinabalu Operational Integration Samarang / Kinabalu Network Optimization Joint Development Plans KNNAG accommodation Helicopter Sharing Marine Vessels Spare Sharing Subsurface Data Sharing 5 Year Integrated Plans Warehousing Facilities optimization with KN and Samarang Gas utilization Liquid handling Debottlenecking Area Development Plans Maximise Utilisation of Existing Infrastructure

17 Corporate Responsibility within Talisman
Supporting our Growth Plans Our Themes Education Health Environment