Integrated Corridor Management Overview and Status Mike Freitas ICM Initiative Coordinator U.S. DOT ITS Joint Program Office.

Similar presentations


Presentation on theme: "Integrated Corridor Management Overview and Status Mike Freitas ICM Initiative Coordinator U.S. DOT ITS Joint Program Office."— Presentation transcript:

1 Integrated Corridor Management Overview and Status Mike Freitas ICM Initiative Coordinator U.S. DOT ITS Joint Program Office

2 2 Initial Definitions Corridor –A corridor is defined as a combination of discrete adjacent surface transportation networks (e.g., freeway, arterial, transit networks) that link the same major origins and destinations. Integrated Corridor Management (ICM) –Integrated corridor management is the coordination of individual network operations between adjacent facilities that creates an interconnected system capable of cross- network travel management.

3 3 Corridors Currently surface transportation systems are made up of several independent networks –Freeways, including managed lanes –Arterials –Bus Routes –Rail Transit Efforts to date to “reduce congestion” have focused on optimization of individual networks These adjacent network links overlay to form transportation corridors –Metropolitan areas contain several major corridors Corridors offer an opportunity to operate and optimize the entire system as opposed to the individual networks

4 4 Integrated Corridor Management

5 5 Missing Integration Institutional Integration –Lack of operational capability and technology that supports cross network distribution of responsibilities and sharing of control Operational Integration –Lack of integrated cross network operational strategies and analysis capabilities Technical Integration –Lack of cross network device-to-device data, communication, and procedure integration

6 6 Integrated Corridor Management Initiative Purpose –The initiative will demonstrate that ITS technologies can be used to efficiently and proactively manage the movement of people and goods in major transportation corridors by facilitating integration of the management of all the networks in a corridor. Goal –The goal of the Integrated Corridor Management Initiative is to provide the institutional guidance, operational capabilities, and ITS technical methods needed for effective Integrated Corridor Management Systems. Approach –Address Institutional, operational, and technical barriers to successful integrated corridor management –Demonstrate how mobility, safety and productivity can be increased in major corridors by Efficient, effective, proactive use of ITS technology Improved use of real-time data sharing Implementing demand management strategies

7 7 ICM Program Plan

8 8 Stakeholder Involvement Stakeholder Work Group –20 representatives Request For Information (RFI) –Gather information on corridor management activities –Study to identify needs –18 Responses Stakeholder Workshops –June 22 and 29 (one workshop, two locations) ITSA –Website http://www.itsa.org/icm.htmlhttp://www.itsa.org/icm.html –Conference Model Deployment Candidate Sites

9 9 Model Deployment Site Selection Approach Two-phased Approach: –Select candidate sites –Select model deployment site from candidate sites

10 10 Phase 1 – Foundational Research Team: Siemens ITS, TransCore, Dunn, SAIC, University of Virginia, Transystems, Howard / Stein-Hudson Major Activities –Program management & stakeholder meetings –Definitions, criteria for delineating a corridor, relationship to regional ITS –Generic Concept of Operations for ICMS –ICM system requirements –Document successful local integration efforts –Identify corridor types, operational approaches / strategies, analysis tools –Analyze associated operational, institutional, & technical integration issues –Develop ICM development feasibility report / briefing –Assist with MDI effort

11 11 Phase 1 Activities To Date Definitions –“corridor” –“integrated corridor management” Concepts for Delineating Corridor Boundaries Relationship Between Corridor & Regional Management Outline for Generic Concept of Operations Stakeholder Meetings Other Ongoing Activities –Review RFI responses, draft generic Con Ops, corridor types and strategies / operational approaches, simulation modeling

12 12 Summary Integrated Corridor Initiative Well Underway Stakeholder Input is Critical Various Venues for Participation –Stakeholder Group –RFI –Workshops –ITSA Website –Model Deployment Partner Solicitation