Presentation is loading. Please wait.

Presentation is loading. Please wait.

INDUSTRIAL TRAINING INSTITUTE

Similar presentations


Presentation on theme: "INDUSTRIAL TRAINING INSTITUTE"— Presentation transcript:

1 INDUSTRIAL TRAINING INSTITUTE
LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details

2 UPGRADATION DETAILS (wherever only upgradation is taken up)
Sr. No. YEAR Sanctioned Seats Filled Seats Admission rate % 1 Aug-06 62  81 130% 2 Aug-07  64 84 131% 3 Aug-08  80 105% 4 Aug-09 68  90 132% TOTAL 274 339 124% Admission Rate % = Filled Seats/Sanctioned Seats * 100

3 Admission Rate % = Filled Seats/Sanctioned Seats * 100
BBBT DETAILS Sr. No. YEAR Sanctioned Seats Filled Seats Admission rate % 1 Aug-06 96  114 119% 2 Aug-07  96 120 125% 3 Aug-08 144 150%  4 Aug-09 132 137% TOTAL 384  510 139% Admission Rate % = Filled Seats/Sanctioned Seats * 100

4 ADVANCE MODULE DETAILS
Sr. No. YEAR Sanctioned Seats Filled Seats Admission rate % August February 1 Aug-07 / Feb-08 96 65 20 67% 21% 2 Aug-08 / Feb-09 73 15 76% 15% 3 Aug-09 / Feb-10 94 31 98% 32% TOTAL 288 232 66 81% 23%  Admission Rate % = Filled Seats/Sanctioned Seats * 100

5 INDUSTRY SPECIFIC MODULE DETAILS
Sr. No. YEAR Filled Seats No. of Industries Admission rate % 1 Aug-07 / Feb-08 2 Aug-08 / Feb-09 3 Aug-09 / Feb-10 TOTAL Admission Rate % = Filled Seats/Sanctioned Seats * 100

6 APPRENTISE TRAINING Sr. No. YEAR DESIGNATED TRADE
NO. OF TRAINEES ENGAGED 1 NA  2    NA  3   4 TOTAL

7 TRANSITION RATE Sr. No. YEAR BBBT to ADVANCE (X) Transition rate 1
Aug-07 / Feb-08 65/20  46% 2 Aug-08 / Feb-09 73/15  40% 3 Aug-09 / Feb-10 94/31  48%  TOTAL 232/66  45%  Note: How Many Students joined Advance Module from the lot of X ( X = BBBT Passed Out - Students who got the Job ) Transition Rate = 100 * No. of Students Admited in Advance Module / X

8 ADVANCE to INDUSTRY SPECIFIC (X)
TRANSITION RATE Sr. No. YEAR ADVANCE to INDUSTRY SPECIFIC (X) Transition rate 1 Aug-07 / Feb-08  0 2 Aug-08 / Feb-09 3 Aug-09 / Feb-10 TOTAL Note: How Many Students joined Specific Module from the lot of X ( X = Advance Module Passed Out - Students who got the Job ) Transition Rate = 100 * No. of Students Admitted in Specific Module / X

9 PASSOUT RATE - BBBT (NCVT Pattern) PASSOUT RATE - ADVANCE MODULE
Sr. No. YEAR Total Appeared Total Passout 1 Jul-07  85 77 2 Jul-08 97  95 3 Jul-09  108 106  TOTAL  290 278  PASSOUT RATE - ADVANCE MODULE Feb-08 55  50 Feb-09 73  68  Feb-10 88  59 21 6 177  PASSOUT RATE - For ITI taken up for upgradation (NCVT Pattern) 59  61   35 35   134 133 

10 PLACEMENT EMPLOYMENT Sr. No. YEAR TOTAL PASSED EMPLOYMENT IN INDUSTRY
EMPLOYMENT Sr. No. YEAR TOTAL PASSED EMPLOYMENT IN INDUSTRY SELF EMPLOYMENT NO. OF REGISTRATION WITH EMPLOYMENT EXCHG. NO. OF CAMPUS INTERVIEW HELD 1 2006 – 07 2007 – 08 463 522 517 210 240 225 NIl 398 475 435 15 20 23

11 AVERAGE MONTHLY SALARY
EARNINGS PER MONTH Sr. No. YEAR AVERAGE MONTHLY SALARY 1 Nil  2 3350  3  3600 Total Average 3475 

12 PROCUREMENT OF GOODS BBBT TRADE (Trade taken for Upgradation) AM
ITI's (FOR 6 BBBT + 3 ADVANCE + 6 UPGRADED TRADES) NAME Total No. of Unit Total Required Qty. Total Available Qty. % Availability BBBT Fundamentals of elect. & comp. 1 172 161 94 % Basic fitting 668 633 95 % Basic mechanical process 818 778 Fundamentals of general chemistry 769 763 99 % Basic Instrumentation 785 96 % Basic unit operation 342 329 AM Advance aocp 510 489 Advance Im 595 486 82 % Advance lacp 250 141 57 % TRADE (Trade taken for Upgradation) FT 2 1041 943 91 % WD 678 648 IT 171 83 % AOCP 1379 1329 LACP 4609 4539 98 % IMCP 970 940 97 %

13 COUNSTRUCTION OF CIVIL WORKS
Sr. No. ADDITION AND ALTERATION / NEW WORK 1 Total Progressive Expenditure incurred Rs lacs. 2 Expected Date of Completion : work completed SET UP OF ADVANCE MODULE WORKSHOP Expected Date of Completion : Work completed CONSTRUCTION PHOTOGRAPHS REQUIRED

14 STAFF VACANCY (To be filled by November-2009)
Sr. No. ITEM No. of Sanctioned No. of Filled No. of Vacant 1 Principal  01 01 2 Teaching Staff 54 44 11 3 Other 20  15 05 Total  75 59  17 

15 No of Instructor Completed training
Training of Trainers Sr. No. Total Instructors No of Instructor Completed training  No. of Instructor CTI Training Year CTI Training POT Training 3 Months CTI Engineering Technology Month CTI Trade Technology 6 Month BBBT AM Other Training more than 7 Days  55 12 02 - 01 03

16 Revenue Generated (Rs.)
REVENUE GENERATION Sr. No. ACTIVITY Revenue Generated (Rs.) 1 Budget I ncome of institute 0230 Labour & employment 4.60 (Please attach detail sheet of Revenue Generation)

17 PLACEMENT BEREAU ACTIVATION
Sr. No. YEAR Total Trainee Pass out Bio Data Placed on Website Registered With Employment Exchange No. of Campus Interview Held No. of Trainee got Job Avg. Salary / Month 1 2 3   Total 77 169 191 437 35 117 162 314 - 10 09 19 --

18 BUDGET - EXPENDITURE DETAILS (Year2009-2010) Remaining Expenditure
Sr. No. Component Budget Provision Expenditure Remaining Expenditure Plan Non Plan Total 1 Miscellaneous  - 19.20 -  19.20 2 Machinery & Equipment  6.00 6.00 5.98 5.98  3 Civil 32.42  32.42 TOTAL

19 WOMAN PARTICIPATION ACTION TAKEN FOR ALLUMNI ASSOCIATION
Sr. No. STEPS TAKEN TO INCREASE PARTICIPATION RESULTS 1 Jagruti abhiyan . Seminar in school. Advertisement   Will be seen in Aug. 2010 ACTION TAKEN FOR ALLUMNI ASSOCIATION Sr. No. STEPS TAKEN TO ASSOCIATE THE ALLUMNI RESULTS 1  Nil Nil

20 ACTIVITY FOR DISADVANTAGE GROUP ORIENTATION PROGRAM FOR IMC
Sr. No. STEPS TAKEN RESULTS 1 Jagruti abhiyan . Seminar in school. Advertisement   Will be seen in Aug. 2010 ORIENTATION PROGRAM FOR IMC Sr. No. STEPS TAKEN RESULTS 1 Meeting Contacts  IMC formed & Expenditure for COE to develop COE sector.

21 RAISING AWARENESS AMONG POTENTIAL STUDENTS & INDUSTRY
Sr. No. STEPS TAKEN RESULTS 1 Industrial visit  - About 200 students visited several Industry. 2 Campus Interview  06 Companies have arranged campus Interview.  187 Students attended & 89 students selected. 3 On Job Training  - 40 trainees will go for on job training during April – 2010. 

22 Best Practices Presentation
PART: 2 Best Practices Presentation 22

23 LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD
ENTRANCE GATE OF ITI Before After

24 SIGN BOARD NEAR GATE OF ITI
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD SIGN BOARD NEAR GATE OF ITI After Before I.T.I. PARDI

25 LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD
ENTRANCE ROAD TO ITI Before After

26 LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD
COE BUILDING Before After

27 LANDSCAPING & FRONTAGE
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD LANDSCAPING & FRONTAGE Before After

28 LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD
ENTRANCE OF BUILDING After Before

29 ENTRANCE OF BUILDING BLOCK B
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD ENTRANCE OF BUILDING BLOCK B

30 BUILDING & WORKSHOP CORRIDORS
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD BUILDING & WORKSHOP CORRIDORS After Before

31 THEORY & AUDIO VISUAL ROOM
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD THEORY & AUDIO VISUAL ROOM Before After

32 LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD
CONFERENCE ROOM After Before

33 Existing workshop for CHBT
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Existing workshop for CHBT Mod.1 - Fundamental of Electronics & Computers Mod.2 - Basic Fittings and Measurements Mod.3 - Basic Mechanical Processes Mod.4 - Fundamental of General Chemistry & Physics Mod.5 - Basic Instrumentation Mod.6 - Basic unit Operations and Processes

34 CHBT-1 Electronics & Computers
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CHBT-1 Electronics & Computers Before After

35 CHBT- 2 Basic Fitting Lab.
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CHBT- 2 Basic Fitting Lab. Before After

36 LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD
CHBT- 3 Mech.Process Lab. After Before

37 LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD
CHBT- 4 Chemistry Lab. Before After

38 CHBT – 5 Instrumentation Lab.
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CHBT – 5 Instrumentation Lab. After Before

39 CHBT – 6 Unit Operation Lab.
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CHBT – 6 Unit Operation Lab. After Before

40 LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD
CHAT 01 ADV. AO Before After

41 LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD
CHAT 03 ADV. IM Before After

42 Instrument Mechanic Lab.
Before After

43 LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD
ELECTRONICS LAB After Before

44 LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD
IT LAB After Before

45 Plastic Processing Operator
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Plastic Processing Operator Before After

46 LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD
Wireman After Before

47 LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD
Mechanic Diesel Before After

48 LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD
COPA Lab. Before After

49 LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD
APPAREL PARK

50 LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD
COE STAFF DRESS CODE Before After

51 PLACEMENT ADVISORY BUREAU
After Before

52 PLACEMENT ADVISORY BUREAU
Before After

53 LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD
Website of ITI

54 Training Materials for each COE Module
Fundamental of Electronics & Computer Lesson No.. Lesson Name 1 Atomic theory 2 Active & Passive components 3 Integrated circuits 4 Logic Gates 5 MS- Word 6 MS- Excel 7 MS - powerpoint 8 AutoCAD

55 Training Materials for each COE Module
Basic Fittings and Measurements Lesson No. Lesson Name 1 Vernier Caliper 2 Micrometer 3 Dial Gauge 4 Hand Tools 5 Drilling Machine 6 Limit- Fit 7 Taps & Die 8 File, Hackshaw, Bench vice

56 Training Materials for each COE Module
Basic Mechanical Processes Lesson No. Lesson Name 1 Lathe machine 2 Cutting tool material 3 Tapper turning 4 Welding 5 Metal joining process 6 Thread cutting 7 Safety precaution

57 Training Materials for each COE Module
Fundamental of General Chemistry & Physics Lesson No. Lesson Name 1 Units & Measurement 2 Viscocity & Density 3 Acid , baise solution 4 Metal & Non metal 5 Transformers 6 Volumetric Analysis 7 Physical dimension

58 Training Materials for each COE Module
Basic Instrumentation Lesson No. Lesson Name 1 Pressure measurement equipments 2 Temperature measurement equipments 3 Level Indicators 4 Purge systems 5 Flow meters 6 PH meter 7 Hygro meter, Hydro meter 8 Anemometer

59 Training Materials for each COE Module
Basic unit Operations and Processes Lesson No. Lesson Name 1 Fluid flow operation 2 Extraction & leaching 3 Absorption & Adsorption 4 Lagging material 5 Distillation 6 Fertilizers 7 Mfg. processes Urea, Soap, Nitric acid etc. 8 Screening 9 Filteration

60 Training Materials for each COE Module
Adv. AOCP Lesson No. Lesson Name 1 Fluid Transportation 2 Valves 3 Pumps 4 Heat transfer 5 Evaporation 6 Distilation & its types 7 Centirifugation 8 Crystalisation 9 Water & Air polution

61 LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD
Energy Saving

62 Status of ISO Certification
ISO Consultant has been selected and order to be given to Ahmedabad neboulous. ISO training has been conducted on dated 5th Jan. 2010, 22nd Feb. 2010, 19th March ISO audit will be conducted on 16th April 2010.

63 Civil Work under CoE For New Building
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Civil Work under CoE For New Building Rs. 32 Lac. Sanctioned for new building. T.S. approved tendering process by PWD. Will be carried out. For New Existing Building Electrification compeleted.

64 LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD
Miscellaneous Expenditure Provision for current year Rs lacs. How many tender issued Nil How many order placed Amount of Expenditure incurred upto 31st March 2010 How much expenditure is to be incurred up to March

65 LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD
Machinery Equipment Provision for current year Rs. 6 lacs. How many tender issued Nil How many order placed Amount of Expenditure incurred upto 31st March 2010. Rs lacs. How much expenditure is to be incurred up to March

66 LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD
Status of On roll in BBBT/ Advance Module On Roll BBBT 132 Advanced AOCP 11 Advanded IMCP Advanced LACP Total 10 164

67 Plantation Open land available in sq. mt. 86821 sq.mt.
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Plantation Open land available in sq. mt. 86821 sq.mt. Perimeter of Boundary wall in meter of compund 1200 mts. How many plants planted in July 2009 5000 Nos. How many plants survived as on 31st March 2010. (984 grown up trees till June 09) Which different type of plants planted in ITI in July 2009 Boganvel, Neem, Saptapadi, Asopalav & others.

68 Plantation

69 LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD
Plantation Survival

70 Plantation

71 Plantation

72 Plantation

73 Plantation

74 Plantation

75 Plantation

76 Plantation

77 Plantation

78 LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD
Seminar on E.M.F.

79 LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD
Staff Meeting

80 THANK YOU


Download ppt "INDUSTRIAL TRAINING INSTITUTE"

Similar presentations


Ads by Google