Download presentation
Presentation is loading. Please wait.
Published byCecil Daniels Modified over 9 years ago
1
Sub-Committee 13 API SC13 Drilling Completion and Fracturing Fluids June 13, 2012 Westminster, Colorado Paul Scott, Chair Johnna Smith, Secretary David Ekas Vice-Chair (terms to June 2013)
2
Sub-Committee 13 Thanks to 21 Sponsors of Summer Social Denver Aquarium – Ashland Host Ashland Baker Hughes Cabot Specialty Fluids Cargill Chandler Engineering Chemstar Products Co. Densimix/Champion/CorsiT Drilling Specialties, CP Chem Elementis Specialties Elkem Materials Fann Instrument Co Grace Instruments Halliburton / Baroid Kelco Oilfield Group Messina, Inc M-I Swaco MWV Spec Chemicals Newpark Drilling Fluids NOV FluidControl OFI Testing Equipment Tetra Technologies, Inc.
3
Sub-Committee 13 Agenda Housekeeping (SC Charge, Roll Call, etc) Previous Meeting Minutes – Approval Upcoming Meetings SC13 API Reporting and Support New Work Items Task Group Updates Old Business New Business Adjourn
4
Sub-Committee 13 SC13 Charge & Intro Develop and Maintain Specifications and Recommended Practices for Drilling, Completion, Fracturing Fluids/Proppants, Fluids Processing Equipment and related subjects
5
Sub-Committee 13 API Email Lists & Roll Call Comment on API Roster & Email List Circulate SC13 Roster for Updates Sign-in sheet Roll Call
6
Sub-Committee 13 Welcome new members (returning participants) Andrea Alba - M-I Swaco Flori Baltoiu – Q’Max Solutions Adam Dotson – OFITE Adel Ansari – Saudi Aramco Gregory Boisson – Imerys Sam Bridges – Derrick Equip David Guetta – Imerys Jamie Jones – BASF Alan Rodgerson – BP Others? Thanks to everyone for attending and participating!
7
Sub-Committee 13 SC13 Meeting Minutes Review & Approve Previous Meeting Minutes – copies distributed after lunch Posted on API website with all TG WG presentations & documents
8
Sub-Committee 13 Winter Mtg SC13 Action Items Review Previous Meeting Action Items: Draft Reports prior to meetings probably not feasible (we all have day jobs) Request First Time Attendee Materials (today) Remind me – Acronym List?? Don Weintritt was granted Emeritus status Help Johnna and me capture action items today
9
Sub-Committee 13 Next API SC13 Meetings 2013 Winter – Jan 21-25, New Orleans, Louisiana 2013 Summer – June 24-28, Washington, DC 2014 Winter - TBD 2014 Summer – June 16-20 Chicago, Illinois
10
Sub-Committee 13 Jim Raney Anadarko CSOEM Chair
11
Sub-Committee 13 SC13 Home Page API Website: Standards – Committee Info - CSOEM – SC13 Sign-in: Email address & 1 st time Password: FirstnameLastname or “Forgot Password”
12
Sub-Committee 13 API Support & Staff Katie Burkle, Standards Associate 202.682.8507 burklek@api.org Roland Goodman, Manager - Upstream Standards 202.682.8571 Goodmanr@api.org David Miller, Director - Standards 202.682.8159 Miller@api.org
13
Sub-Committee 13 SC13 New Work Items SR3 Forms New Work Items SR3s and SC13 Voting Business: a)TG2 Publications SR3 for $20,000 year b)TG4 WBM and Lab Testing WG3 PSD of Materials SR3 for $50,000 for Independent Lab Testing to Validate Procedure c)TG8 WG1 API Reference and Calibration Materials Custodian SR3 for $20,000/yr to fund new custodian – Oct 2012 forward
14
Sub-Committee 13 TG2 Publications: Scott TG2 Chair Short Term Solution: Co-Chair Paul Scott and Bernard Fraboulet Update on API / ISO Relationship ISO / API Request for ruling OGP Interim Solution
15
Sub-Committee 13 TG2 Publications: Scott Approved SR3 for $20,000/yr to fund Publications Editor (Cheryl Stark or other) SR3 for Funded Technical Reviewer is Bob Garrett Review Status of Documents – TG2 PPT Need to draft work flow
16
Sub-Committee 13 WG1: Oil Mud Chemical Analysis – Hibernation WG3: Particle Size Distribution Testing of OBM / SBM –Chair Scott Klasner Halliburton –Have NAF model fluid, SOP collected were very different, sampling is critical equipment manufacturers are on WG –Will Evaluate Preliminary Data on model NAF –Determine critical parameters to be used –Target draft RP Jan 2014 Work Group 4 – Measurement of NAF Internal Phase Activity Modifiers Chairman: Brent Estes Update from Fann on bad PnP – seems to be resolved TG3 OBM Testing: Shumate
17
Sub-Committee 13 TG4: WBM & Lab Testing: Growcock for Breeden WG1 Simulated Drill Solids, Have done round robin so far clays have not been acceptable, ongoing. Will look at clays in water and compare to Rev Dust WG? PSD of Bridging Agents / LCMs Materials Fred Growcock Chair, compare methods and perform round robin to develop procedure, approved funding request for validation $50,000 WG?HPHT Viscometers Breeden to Chair initially, Had teleconference and sharing procedures, plan round robin on different types of viscometers then generic procedure
18
Sub-Committee 13 TG4: WBM & Lab Testing: Growcock for Breeden New Business: Pressure vessels for HTHP filtration cells, PPA cells, and static aging cells Issue of SG to use for weighting material in retort calculations for Low-Gravity Solids Old Business Abrasion Testing (Superior Graphite) Dave Derwin submitted report blade were not coated supports data, has 100+ blades he will give to any lab until supply is exhausted, then need to take up new specs.
19
Sub-Committee 13 TG5: Solids Control Equipment: Stocks for Robinson WG1 SCE RP13C Andrea Alba Chair: Clause 5 and 6 and old charge to demonstrate benefits of improved SCE Has met and has good membership Needs to sort out revised charge Plans survey WG2 RP13C Inform users of RP13C Screen designation and look to Testing monogram / certification program to purge violators from industry Still evaluating various API Monogram / Certification Program Published AADE paper and API RP13C FAQs Have color coded RP13C Considering Specification document (split RP13C) for Monogram
20
TG # 6 Report TG-6: Testing of Heavy Brine: Javora Revised TG Charge to delete ISO reference Revisions to Testing of Heavy Brines RP13J is drafted with many changes corrections and needs format style editing then will go to ballot PCT Work Group Don Isaac Chair: Had round robin and have draft final document Return Permeability WG Dodie Ezzat, Ongoing plan to develop common test method without round robin testing
21
TG # 6 Report TG-6: Testing of Heavy Brine: Javora Displacement WG, Ed Malachosky and Bruce Fry Co-Chairs, no activity plan but new energy Hydrate WG, Compare calculation methods Scale Judy Guy-Caffey, WG has document outline Emulsion Technology Work Groups in progress, have plan for round robin CRA Program progress discussed continues
22
Sub-Committee 13 TG7 Rheology & Hydraulics Chair Meehan / Vice Chair Zamora
23
Sub-Committee 13 TG-8, Drilling Fluid Materials: Wilkin WG1: Reference Materials: SEBC lot approved. Have plan for custodian. New fundingWG1: Reference Materials: SEBC lot approved. Have plan for custodian. New funding WG5: Starch Specifications Saleh Al-Ammari, Have had meetings and deciding on specifications to include and define parametersWG5: Starch Specifications Saleh Al-Ammari, Have had meetings and deciding on specifications to include and define parameters Need to address issues raised on systematic review of ISO documentNeed to address issues raised on systematic review of ISO document Discussed proposal for new WG to look again at gas pycnometer for determining SG of bariteDiscussed proposal for new WG to look again at gas pycnometer for determining SG of barite SC13 – Drilling Completion and Fracturing Fluids
24
Sub-Committee 13 TG9 Fracturing Fluids: Asadi Met with API Roland Goodman and others to discuss API ISO relationship Asadi to determine ISO WG future and will advise
25
Sub-Committee 13 TG10 Proppants: Penny Minimal communication from Glenn Penny no information on what they are doing and what they plan to do given the API ISO situation
26
Sub-Committee 13 WG on Business Practices: Polnaszek Have near final document to be distributed for review SR3 for long term storage working on external storage method in conjunction with API website for current data
27
Sub-Committee 13 SC18 on Quality Q1 Monogram Liaison Report Johnna Smith (Halliburton) Liaison from SC13 to SC18
28
Sub-Committee 13 Comments on this meeting Good attendance Having true work group meetings on first day was good and will be continued Will stay with Tuesday Wednesday schedule – need to know sooner if Monday activities are desired Will ask API and CSOEM once again for wireless internet and to coordinate special breaks snacks with our meetings
29
Sub-Committee 13 Closing Comments Thanks for Volunteering! Feel free to contact me with comments concerns feedback Comments about meeting?
30
Sub-Committee 13 Are we finished? Review New Action Items OLD BUSINESS NEW BUSINESS ADJOURN
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.