Presentation is loading. Please wait.

Presentation is loading. Please wait.

Purposes and Ideas Behind the Project Esau – I have a interest in a career that involves natural resources. Austin – I am a new student at Wildlands this.

Similar presentations


Presentation on theme: "Purposes and Ideas Behind the Project Esau – I have a interest in a career that involves natural resources. Austin – I am a new student at Wildlands this."— Presentation transcript:

1

2 Purposes and Ideas Behind the Project Esau – I have a interest in a career that involves natural resources. Austin – I am a new student at Wildlands this year. This project sounded like a great way to start the year. Brett – I also have an interest in a career in natural resources.

3 The Issues Sedimentation Issues and Mapping Water Quality Issues and Trophic State Flushing Rate

4 Sedimentation/Mapping… Background/Problem How has the pond changed over the last 5 years?

5

6

7

8 2006 Fall Creek Pond Depth Map

9 2011 Fall Creek Pond Depth Map

10 Trophic State… What is it? Why is it important? How is it calculated?

11 These are the three main Trophic States... Oligotrophic Mesotrophic Eutrophic

12 Oligotrophic

13 Mesotrophic

14 Eutrophic

15 How We Converted Our Data Trophic State Index Fall Creek Pond 2011-12 Site 1 Site 2 Site 3 Secchi in m Chl - a ppb Total P ppb Secchi in m Chl - a ppb Total P ppb Secchi in m Chl - a ppb Total P ppb 9/15/20110.69 309 300 9/15/20111.524 91 189 9/15/20110.762 10 166 9/26/20111.1 100 264 9/26/20111.1 46 238 9/26/20111.37 86 212 10/4/20111.2 35 241 10/4/20111.5 17 388 10/4/20111.7 38 365 10/25/20110.61 123 254 10/25/20110.76 87 218 10/25/20110.76 90 395 11/7/20110.76 76 232 11/7/20110.69 68 551 11/7/20111.37 234 805 Trophic State numbers derived visually from Carlson’s Trophic State Index graphic from EPA’s Lake and Reservoir Restoration Guidance Manual. Secchi in m Secchi TSI Chl - a ppb Chl TSI Total P ppb P TSI 9/15/20111.060136.778218.380 9/26/20111.25877.374238.080 10/4/20111.55530.065331.380 25-Oct0.765100.075289.080 11/7/20110.962126.077529.380 Raw Data Data averages converted to Trophic State Index values

16 Carlson’s Trophic State Index

17 Where is the Fall Creek Pond on this scale?

18 Flushing Rate… What is it? Why is it important? How is it calculated?

19 Flushing Rate Calculations… To Determine Flow Rate – Inflow and Outflow Inflow =.2562 meters cubed/second = 22,135.68 meters cubed/day Outflow =.2246 meters cubed/second = 19,405.44 meters cubed/day Averaged =.2404 meters cubed/second = 20,770.56 meters cubed/day – Volume of the pond = 95,780 meters cubed – 95,780 meters cubed/20,770.56 meters cubed/day = 4.6 days of hydraulic residence time

20 Conclusion… Tying it all together New Map Flushing Rate Sedimentation Rate Trophic State

21


Download ppt "Purposes and Ideas Behind the Project Esau – I have a interest in a career that involves natural resources. Austin – I am a new student at Wildlands this."

Similar presentations


Ads by Google