Presentation is loading. Please wait.

Presentation is loading. Please wait.

Wastewater/Stormwater Discharge Permit Fee Restructuring The next 10 years… Presented By: Mike Herold.

Similar presentations


Presentation on theme: "Wastewater/Stormwater Discharge Permit Fee Restructuring The next 10 years… Presented By: Mike Herold."— Presentation transcript:

1 Wastewater/Stormwater Discharge Permit Fee Restructuring The next 10 years… Presented By: Mike Herold

2 Permit Program Changes  General permits  New permit categories  Permit population  TMDLS  Future changes?  Others?

3 Permittee Population No. of Permittees

4 Fee Adjustments  Fiscal Growth Factor Increases  Municipal Cap  Legislative Caps  General Permit Fee Setting

5 Permit Revenue by Sector

6 Desired or Ideal Program  Renew permits where needed  General permit strategy  Compliance emphasis  Inspection presence  Self-sustaining  Keeps pace with new requirements

7 Fee Basis Options  Cover cost of program  Provide incentives  Based on discharge quality/quantity factors  Any change phased in over time

8 Covering Cost  Means tracking cost and providing accountability: Workload model and Time Accounting system  Questioning and assigning priorities  Anticipating new program requirements

9 Providing Incentives  Incentives to reduce program costs  Incentives to reduce discharge impact

10 Discharge Quality/Quantity Factors  Concentration  Toxics  Loading  Conventionals  Keep it simple  Fee factor

11 Future Program Trends  Permit amnesty  Lien authority for delinquent accounts  Sector fees managed by 3 rd party  Additional fees for special service (engineering reviews)

12 Time Spent on Permit Actions (93-95, 95-97, 97-99, and 07-09 Biennia)

13 Any Questions Thank you!


Download ppt "Wastewater/Stormwater Discharge Permit Fee Restructuring The next 10 years… Presented By: Mike Herold."

Similar presentations


Ads by Google