Mission Support Construction Update Mr. Jim Schaefer HQ PACAF/CEC.

Similar presentations


Presentation on theme: "Mission Support Construction Update Mr. Jim Schaefer HQ PACAF/CEC."— Presentation transcript:

1

2 Mission Support Construction Update Mr. Jim Schaefer HQ PACAF/CEC

3 Major Construction Funding $1.26 Billion Total Construction In Progress Mission Support Portion That Affects Airfield Ops

4 ELMENDORF AFB HICKAM AFB ANDERSEN AFB KADENA AB YOKOTA AB MISAWA AB OSAN AB KUNSAN AB EIELSON AFB Mission Support Construction DIEGO GARCIA Repair Airfield Pvmnt, $5.9M Repair Runway, $14M Repair Parking Ramp, $4M Hydrant Fueling Sys, DLA $26M Hydrt Fuel Sys-Ph1, DLA $24.3M Repair Runway, JFIP $36.6M Bulk Fuel Storage, DLA $21.7M Hydrt Fuel Sys-Ph1, DLA $19.5M Hydrt Fuel Sys-Ph2, DLA $23.5M C-130 Parking Ramp, $17M Contingcy Pamnt, CDIP, $4.5M Access Taxiway, CDIP, $3.9M Widen Taxiway Alpha, JFIP

5 4 Eielson Repair Runway FY00 MILCON, $14MFY00 MILCON, $14M Replace old asphalt runway with 75’ concrete keel Replace old asphalt runway with 75’ concrete keel Planned construction:Planned construction: 1 May - 13 Sep 00 1 May - 13 Sep 00 Mission Implications: Runway shutdown for 135 daysMission Implications: Runway shutdown for 135 days

6 5 Eielson Repair Parking Ramp FY00 MILCON, $4MFY00 MILCON, $4M Replace old asphalt ramp (concurrent w/ $26M DLA FY00 Refuel Hydrant project) Replace old asphalt ramp (concurrent w/ $26M DLA FY00 Refuel Hydrant project) Planned constructionPlanned construction 1 May - 13 Sep 00 1 May - 13 Sep 00 Mission Implications: Ramp down 135 daysMission Implications: Ramp down 135 days

7 6 Eielson Hydrant Fueling Sys FY00 DLA MCP,$26MFY00 DLA MCP,$26M Install 20 fueling hydrants on main ramp (concurrent w/ repair KC-135 ramp) Install 20 fueling hydrants on main ramp (concurrent w/ repair KC-135 ramp) Planned constructionPlanned construction 1 May - 13 Sep 00 1 May - 13 Sep 00 Mission Implications: 5-month ramp disruptionMission Implications: 5-month ramp disruption

8 7 Elmendorf Bulk Fuel Storage FY98 DLA MCP,$21.7MFY98 DLA MCP,$21.7M Adds 3 new 83,000 BL JP-8 bulk fuel storage tanks on-base Adds 3 new 83,000 BL JP-8 bulk fuel storage tanks on-base Status:Status: 96% Cns/ECD Dec 99 96% Cns/ECD Dec 99 Mission Implications: Doubles on-base fuel storage for air bridgeMission Implications: Doubles on-base fuel storage for air bridge

9 8 Elmendorf Hydrt Fuel Sys, Ph 1 FY99 DLA MCP,$19.5MFY99 DLA MCP,$19.5M Remove 14/Install 15 fueling hydrants on North ramp (airbridge) Remove 14/Install 15 fueling hydrants on North ramp (airbridge) Status:Status: 38% Cns/ECD Feb 00 38% Cns/ECD Feb 00 Mission Implications: Reduced parking during constructionMission Implications: Reduced parking during construction N

10 9 Elmendorf Hydrt Fuel Sys, Ph 2 FY00 DLA MCP,$23.5MFY00 DLA MCP,$23.5M Replace 15 fueling hydrants on North ramp (airbridge) Replace 15 fueling hydrants on North ramp (airbridge) Planned constructionPlanned construction Dec 99 - Dec 01 Dec 99 - Dec 01 Mission Implications: Reduced parking during constructionMission Implications: Reduced parking during construction

11 10 Elmendorf C-130 Parking Ramp FY00 MILCON, $17MFY00 MILCON, $17M Constructs new C-130 parking ramp w/11 fuel hydrants Constructs new C-130 parking ramp w/11 fuel hydrants Planned constructionPlanned construction Dec 99 - Dec 01 Dec 99 - Dec 01 Mission Implications: Minimal impact during construction; will enhance capabilityMission Implications: Minimal impact during construction; will enhance capability

12 11 Hickam Repair Airfield Pvmnt FY99 MILCON, $5.9MFY99 MILCON, $5.9M Parking ramp repair to preclude major FOD problems Parking ramp repair to preclude major FOD problems Status:Status: 80% Cns/ECD Dec 99 80% Cns/ECD Dec 99 Mission Implications: 15% reduced parking during constructionMission Implications: 15% reduced parking during construction

13 12 Yokota Replace Runway JFIP HNFC, $36.6MJFIP HNFC, $36.6M Overlay runway with 13.5” thick concrete Overlay runway with 13.5” thick concrete Planned construction Oct 00 - Apr 01 (2 Phases)Planned construction Oct 00 - Apr 01 (2 Phases) Mission Implications: Only partial runway accessible to C-17,Mission Implications: Only partial runway accessible to C-17, C-21, C-130

14 13 Andersen Hydrt Fuel Sys, Ph 1 FY00 DLA MCP,$24.3MFY00 DLA MCP,$24.3M Replace 20 fueling hydrants, Southwest ramp Replace 20 fueling hydrants, Southwest ramp Planned constructionPlanned construction Dec 99 - Dec 01 Dec 99 - Dec 01 Mission Implications: Limited hydrants for surge capabilityMission Implications: Limited hydrants for surge capability

15 14 Kunsan Contingency Pavement CY96 CDIP $4.5MCY96 CDIP $4.5M New fighter parking ramp at Taxiway “6” New fighter parking ramp at Taxiway “6” Status:Status: 22% Cns/ECD Apr 00 22% Cns/ECD Apr 00 Mission Implications: New contingency parking for 16 fighter aircraft (in revetments)Mission Implications: New contingency parking for 16 fighter aircraft (in revetments) N

16 15 Kunsan Access Taxiway CY97 CDIP $3.9MCY97 CDIP $3.9M New taxiway to connect Contingency Runway and north loop aircraft parking area New taxiway to connect Contingency Runway and north loop aircraft parking area Planned construction Dec 99 - Apr 00Planned construction Dec 99 - Apr 00 Mission Implications: Improved use of alternate runway and aircraft movementMission Implications: Improved use of alternate runway and aircraft movement

17 16 Misawa Widen Taxiway Alpha JFY00 Japanese Facilities Improvement ProgramJFY00 Japanese Facilities Improvement Program HQ AFCEE Site Study in Dec 99 to determine if parallel runway feasibleHQ AFCEE Site Study in Dec 99 to determine if parallel runway feasible Cost/Scope: TBDCost/Scope: TBD Criteria Package to be completed by Jun 00Criteria Package to be completed by Jun 00 Construction Period: TBDConstruction Period: TBD Mission Implications: TBDMission Implications: TBD