Presentation is loading. Please wait.

Presentation is loading. Please wait.

Douglas Reynolds (PM), Edward Harding, Ben Willoughby, Alex Tuzzeo Advanced Group Project Presentation 2 Team 4.

Similar presentations


Presentation on theme: "Douglas Reynolds (PM), Edward Harding, Ben Willoughby, Alex Tuzzeo Advanced Group Project Presentation 2 Team 4."— Presentation transcript:

1 Douglas Reynolds (PM), Edward Harding, Ben Willoughby, Alex Tuzzeo Advanced Group Project Presentation 2 Team 4

2 Douglas Reynolds (PM), Edward Harding, Ben Willoughby, Alex Tuzzeo Contents Progress to date In Progress Project Iterations Promo Trailer Plans Redmine Product Demo

3 Douglas Reynolds (PM), Edward Harding, Ben Willoughby, Alex Tuzzeo Progress to date Planning documentation complete Database Version 3.0 complete Database Testing complete Web Service Version 1.0 complete Website Version 1.0 complete Test Plan complete Facebook Application Version 1.0 complete

4 Douglas Reynolds (PM), Edward Harding, Ben Willoughby, Alex Tuzzeo Changes since first Presentation Rebranding Tokens instead of real currency Removed currency withdrawals Removed popular bets (Website) Addition of Facebook application Addition of both adjudicated bets & un-adjudicated bets Addition of leader board Addition of token regeneration Addition of token prize structure Addition of security (E.g. users cannot log in from same IP address)

5 Douglas Reynolds (PM), Edward Harding, Ben Willoughby, Alex Tuzzeo In Progress Website Version 2.0 (Alex) Combining Aspects (System Architecture) (All group members) Testing all components (Test Driven Development) (All group members) Encryption (Ben) Design Patterns (Connection Pooling & Dependency Injection) (Edd & Ben) Project Management (Doug)

6 Douglas Reynolds (PM), Edward Harding, Ben Willoughby, Alex Tuzzeo Project Iterations Iteration 1 (14 th December 2012) (Project Planning complete, Test Plan complete, Designs Complete) Iteration 2 (18 th January 2013) (Project BETA complete incl. background components) Iteration 3 (15 th March 2013) (Product Finished, Trailer BETA complete, Iteration 4 (1st April 2013) (Evaluation Documentation complete)

7 Douglas Reynolds (PM), Edward Harding, Ben Willoughby, Alex Tuzzeo Promo Trailer Plans Product Demonstration Voice Over Explains How it Works With Explains Background Explains Product Features Which Idea Inspired by…. Scenario of why it would be used… Demo of process involved… Security, Usability & Functionality… Website Aspects… Token rewards system… Length: 90s Target Audience: Male aged 18-30

8 Douglas Reynolds (PM), Edward Harding, Ben Willoughby, Alex Tuzzeo Redmine Clocked over 600 Hours Minimalistic approach with big focus on rewards On target – A few tasks overdue Good estimates on time needed Team needs to improve time logging Group is managed mostly with meetings and other forms of contact. Redmine only used as a general guide

9 Douglas Reynolds (PM), Edward Harding, Ben Willoughby, Alex Tuzzeo Product Demo Website is currently under reconstruction. After a focus group reacted poorly to the look and feel of the original website, we are rebuilding it in the theme that you see above.


Download ppt "Douglas Reynolds (PM), Edward Harding, Ben Willoughby, Alex Tuzzeo Advanced Group Project Presentation 2 Team 4."

Similar presentations


Ads by Google