 5 ship docks designed for Aframax tankships 80K - 120K DWT  Mooring piles with quick-release capabilities  Mooring system analysis being conducted.

Similar presentations


Presentation on theme: " 5 ship docks designed for Aframax tankships 80K - 120K DWT  Mooring piles with quick-release capabilities  Mooring system analysis being conducted."— Presentation transcript:

1

2

3  5 ship docks designed for Aframax tankships 80K - 120K DWT  Mooring piles with quick-release capabilities  Mooring system analysis being conducted for slightly smaller LPGCs

4  Transfer propane/butane to/from liquefied gas carriers  Dual purpose – import and export of propane and butane based upon market demand  Annual throughput ~72,600,000 bbl

5  Slightly smaller than AFRAMAX  Capacities up to 83,000 m 3  Fully refrigerated  Estimate 7-9 /mo  Maximum 11/ mo

6  Sabine Pilots  Sabine Neches Navigation District (SNND)  USCG MSU

7  No unusual challenges  LPGCs within the size range for night transit  Traffic increase within usual ranges  No differences compared to other traffic

8  Same issues as for as LNG until get above Golden Pass  Project width 400 - 800 ft  Depth 40 ft minimum  Port Arthur Ship Canal –no developed areas

9  West Port Arthur / City of Port Arthur  Residential/industrial at Port Neches  Residential areas at Nederland ~1.4 miles from dock  Environmental Resources  LPG operations present no new risks for those areas

10  Modest increase in deep draft vessel traffic volume  2,800 vessel arrivals & 71,000 barge transits in 2012  20% to/beyond Sunoco  8 LPGCs/mo = 96/yr = 3.4% increase  11 LPGCs/mo = 132/yr = 4.7% increase

11  Pilots – 29 pilots and 2 trainees – Adequate for expected levels of operations  Tugs – local fleet = 11 vessels – #1 concern overall – Fleet might have to grow to meet demand

12 Safety Risk Assessment Summary

13

14  Waterways leading to the Mariner South Project LPG Terminal at Nederland, TX are suitable for marine LPG operations

15  Tom Rodino-Consultant ◦ Office: 956-233-9931 ◦ tom@rodinoinc.com tom@rodinoinc.com  Wayne Turner-Terminal Manager ◦ Office: 409-721-4824 ◦ gwturner@sunocologistics.com gwturner@sunocologistics.com  Glenda Davalos- Operations Integration Manager, Mariner South Project ◦ Office: 409-721-4863 ◦ ggdavalos@sunocologistics.com ggdavalos@sunocologistics.com  Ellen Clark-Supervisor-Lab, Lubes, Security ◦ Office: 409-721-4851 ◦ emclark@sunocologistics.com emclark@sunocologistics.com  Joey Mahmoud-Vice President Engineering, Energy Transfer ◦ Office: 281-714-2042 ◦ Joey.Mahmoud@energytransfers.com