M EDCO E NERG I MINING Page 1 of 26 F. Hary Kristiono 2009 : Head of Business Development & Marketing – Medco Energi Mining International Ltd. 2007 : Head.

Similar presentations


Presentation on theme: "M EDCO E NERG I MINING Page 1 of 26 F. Hary Kristiono 2009 : Head of Business Development & Marketing – Medco Energi Mining International Ltd. 2007 : Head."— Presentation transcript:

1 M EDCO E NERG I MINING Page 1 of 26 F. Hary Kristiono 2009 : Head of Business Development & Marketing – Medco Energi Mining International Ltd. 2007 : Head of Business Development – Medco Mining Ltd. 2005 : General Manager – Trada Resources Indonesia Ltd. 2003 : Logistic & Transport Manager – BHPBilliton Marketing AG. 2001 : Market Analyst Supt. – BHP Indonesia Ltd. 2000 : Marketing Strategic Planning Supv. – Arutmin Indonesia Ltd. 1999 : Market Coord. North Asia & America – Arutmin Indonesia Ltd. 1995 : Coal Washplant Senior Metallurgist – Arutmin Indonesia Ltd. 1992 : Coal Analyst – Geoservices Indonesia Ltd. Graduated from Mining Engineering, Institute Technology of Bandung, majoring in Coal Processing

2 M EDCO E NERG I MINING In Pursuit Coal Value in Use New Delhi, 22 Aug 2014 Finding Niche Market of High CV and Sulfur Coal

3 M EDCO E NERG I MINING Page 3 of 26 PT Medco Energi Internasional Tbk Our History

4 M EDCO E NERG I MINING Page 4 of 26 PT Medco Energi Internasional Tbk Who are We

5 M EDCO E NERG I MINING Page 5 of 26 PT Medco Energi Internasional Tbk At a Glance

6 M EDCO E NERG I MINING Page 6 of 26 PT Medco Energi Internasional Tbk Domestic Oil and Gas Business

7 M EDCO E NERG I MINING Page 7 of 26 PT Medco Energi Internasional Tbk International Oil and Gas Business

8 M EDCO E NERG I MINING Page 8 of 26 PT Medco Energi Internasional Tbk Coal Mining and Power Plant Business

9 M EDCO E NERG I MINING In Pursuit Coal Value in Use New Delhi, 22 Aug 2014 Medco Energi Mining Internasional

10 M EDCO E NERG I MINING Page 10 of 26 Coal Resources Profile Focus in High CV Coal for Foothold 1 DTR 2 DTSA 1 2 DTR - DTSA

11 M EDCO E NERG I MINING Page 11 of 26 Coal Production Profile About One Million Prod Capacity Within 4 Years Production Plan Total Annual Production (kT)

12 M EDCO E NERG I MINING Page 12 of 26 Tenement IUP DTR All in Place and Secured 1.IPP (Borrow & Use Forestry) Permit from Forestry Dept. by Oct 2011 2.Private Coal Port Permit by Ministry of Transportation has been obtained by January 2013 3.East Kalimantan Governor Recommendation for Land Use Permit for 520Ha at Mar 2010. 4.IUP Operation & Production : For 1,700 Ha validity from Feb 2010 to Jan 2017 5.Environmental Impact Analysis Study for 1,700 Ha at January 2010 6.Feasibility Study for 1700 Ha at Dec 2009 7.Agreement with Adindo Hutani Lestari for exploration and exploitation at Sept 2009. 8.Permit to Enter Forestry Area (IMK) from Ministry Forestry for exploration in forest area at May 2009 for 1,700 Ha. 1.IPP (Borrow & Use Forestry) Permit from Forestry Dept. by Oct 2011 2.Private Coal Port Permit by Ministry of Transportation has been obtained by January 2013 3.East Kalimantan Governor Recommendation for Land Use Permit for 520Ha at Mar 2010. 4.IUP Operation & Production : For 1,700 Ha validity from Feb 2010 to Jan 2017 5.Environmental Impact Analysis Study for 1,700 Ha at January 2010 6.Feasibility Study for 1700 Ha at Dec 2009 7.Agreement with Adindo Hutani Lestari for exploration and exploitation at Sept 2009. 8.Permit to Enter Forestry Area (IMK) from Ministry Forestry for exploration in forest area at May 2009 for 1,700 Ha.

13 M EDCO E NERG I MINING Page 13 of 26 Total Drilling : 662 holes (21,674m), and still adding Exploration Detail Drilling Dense Holes and Proven Coal Total Geophysical Logging : 331 holes (10,983m) Total Topographic Survey: 1.052 Ha Scale 1:1000 Bata s Kons esi AHL Tana man Akas ia AHL Tan ama n Kela pa saw it NJL

14 M EDCO E NERG I MINING Page 14 of 26 Resources and Reserves 13Mio mt Resources & 4Mio mt Reserves Resources and Reserves 1,700HaTotal (MT) North Block Resources378,632 Middle Block Resources1,046,633 West,South and SE Block Resources11,832,430 All DTR Resources (50 m depth) for 1,700Ha13,248,695 South Block only for 300Ha Reserves (SR 1:15)2,400,000 North Block Middle Block All South Block

15 M EDCO E NERG I MINING Page 15 of 26 Medco Bara Coal Total 15 of 21 Ship to India and China Cement

16 M EDCO E NERG I MINING Page 16 of 26 PT. DTR coal quality is analyzed by PT. Sucofindo Standard: ISO and ASTM Test Method: Rapid and Standard Test Lab: Tarakan Lab and PMJ site Lab Man Power: Management Stockpile : To provide Management Stockpile for PT. DTR to ensure coal quality target achieve NoPositionPerson 12341234 Coal Technologist Ass. Coal Technologist Production Supervisor Ass. Production 13191319 Total Man Power13 Quality Management Pit to Port Point Sampling 3 and Samples 150 lot for 50kt Coal

17 M EDCO E NERG I MINING Page 17 of 26 Quality Management Pit to Port Daily Report Sent to Buyer before Vessel ETA

18 M EDCO E NERG I MINING Page 18 of 26 Quality Management Pit to Port Quality Assurance Performances

19 M EDCO E NERG I MINING Page 19 of 26 Coal Marketing Strategy Indonesia High Sulfur Coal Producer

20 M EDCO E NERG I MINING Page 20 of 26 Coal Marketing Strategy Utilization High Sulfur Coal: Cement & Smelting Plant Portland cement is formed from a predetermined homogeneous mixture of raw materials comprising lime (CaO), silica (SiO2) and a small proportion of alumina (Al2O3) and iron oxide (Fe2O3). In the cement production process, the above raw materials are preheated, calcined and sintered to form clinker. Gypsum (CaSO4) is added to the clinker for controlling the setting time of the cement. The use of high sulfur coal give some benefits for cement production process. High sulfur coal must have higher heating value since combustion of sulfur produce more energy. Sulfur in coal release SO2 that reacted with CaO in calciner and kiln to produce gypsum or CaSO4. In addition coal ash contains lime (CaO), silica (SiO2), alumina (Al2O3) and iron oxide (Fe2O3) which is required in cement production. Thus the use of high sulfur will have significant contribution to the energy and raw material cost reduction in cement manufacturing process. Smelting of sulphide ores not only produce metal but also energy. Oxydation of sulphur of the ore produce energy to be used for the smelting although additional fuel is needed to maintain the reactor at high temperature. As the content of sulfur in the ore is about 30% (Copper or case), the flue gas contain high concentration of SO2 which should be processed to yield sulfuric acid. Currently 20% of world sulfuric acid production is come from smelter. The use of high sulfur coal as fuel for the smelter will increase the production capacity of sulfuric acid plant.

21 M EDCO E NERG I MINING Page 21 of 26 Coal Marketing Strategy High Sulfur Coal vs Petcoke

22 M EDCO E NERG I MINING Page 22 of 26 Logistic and Transport Plan Shortest route and ease delivery Port Load Out: - Width River : 100 m - Depth River (Mid) : 5.5 m Anchorage Point: - Max. Load Rate : 8,000 tpd - Depth Anchorage : 16.0 m Port Load Out: - Width River : 100 m - Depth River (Mid) : 5.5 m Anchorage Point: - Max. Load Rate : 8,000 tpd - Depth Anchorage : 16.0 m

23 M EDCO E NERG I MINING Page 23 of 26 Private Port Load Out Vessel Performance 75% Dispatch Position Barge Loading Plan Details Port : ROM Stockpile Cap : 60 kt Crushing Stockpile Cap : 60 kt Crushing Plan Cap : 300 tph Barge Loading Conveyor: 1,000 tph

24 M EDCO E NERG I MINING Page 24 of 26 Coal Mining Activity Full Capacity of 55Kt per month OB Removal & Coal Getting Mining Activities Highlight : 1.Coal Quality Control managed by Sucofindo 2.Proven Production rate at 55kt of coal per month Highlight : 1.Coal Quality Control managed by Sucofindo 2.Proven Production rate at 55kt of coal per month Coal Quality Control at Pit Reclaim & Revegetation Transshipment at Anchorage Product Stockpile Pit & Camp Situation

25 M EDCO E NERG I MINING Page 25 of 26 Coal Crushing Plant- 300 tph Highlight : 1.Coal Crushing Plant 300 tph3. Total Shipment at 21 Shipment up to now 2.Barge Loading Conveyor – 1000 tph4. Market Destination to China & India Highlight : 1.Coal Crushing Plant 300 tph3. Total Shipment at 21 Shipment up to now 2.Barge Loading Conveyor – 1000 tph4. Market Destination to China & India Port Progress and Activity Excellent Performance up to now : 21 Shipments Maiden Shipment Crushed Product Pile Barging to Anchorage PRODUCT PILE

26 M EDCO E NERG I MINING Page 26 of 26 Non Staff Camp Engineering RoomAdmin Room Staff CampOffice Infrastructure Progress & Activity DTR Camp and Office Clinic and Mosque

27 M EDCO E NERG I MINING Page 27 of 26 F. Hary Kristiono – Head of Business Development & Marketing f.hary.kristiono@medcoenergi.com Mobile +62 812 821 9517 PT Medco Energi Mining Internasional Tel +62-21 2995 3279 Fax +62-21 821 1381 The Energy Building 51 st floor SCBD Lot 11A Jl. Jend Sudirman Kav. 52-53 Jakarta 12190, Indonesia www.medcoenergi.com Thank You