Presentation is loading. Please wait.

Presentation is loading. Please wait.

After-the-Fact Workgroup Update Sheryl Welch ISAS Meeting 01/28/2015 Salt Lake City, UT.

Similar presentations


Presentation on theme: "After-the-Fact Workgroup Update Sheryl Welch ISAS Meeting 01/28/2015 Salt Lake City, UT."— Presentation transcript:

1 After-the-Fact Workgroup Update Sheryl Welch ISAS Meeting 01/28/2015 Salt Lake City, UT

2 2 o Meeting was held yesterday. o Object was to tighten the guidelines due to incident that took place in May.  Caused a BA to go off ATEC.  Effective April 1, 2014, WECC Standard BAL-004-WECC-02 R3: Each Balancing Authority shall keep its ATEC in service, with an allowable exception period of less than or equal to an accumulated 24 hours per calendar quarter for ATEC to be out of service. o Following changes were made. ATF Tagging Guidelines

3 3 o Plan is to post by end of the week for comments o All comments will be due by Mid-March. o Webinar will be held to go over comments. o Final posting by March 21 st. o Present to the ISAS Group on April 21 st for approval. ATF Tagging Guidelines (Cont’d)

4 2014/2015 ATF WIT Changes 2014 ATF Tag/WIT Changes 2015 ATF Tag/WIT Changes REASONCOUNT REASONCOUNT Incorrect Path or Sched Entity56 Incorrect Path or Sched Entity Scheduling or Adjusting Error20 Scheduling or Adjusting Error2 System Error3 Generation/Meter Adjustment40 Generation/Meter Adjustment4 Incorrect Source / Sink246 Incorrect Source / Sink Curtailment Error3 Incorrect PSE0 RSG Tag Error9 Integration Error0 Tag Type Correction49 Tag Type Correction Unknown Reason4 TOTAL430 TOTAL6 *2013 ATF Tag count = 88 *2012 ATF Tag count = 87

5 Questions?


Download ppt "After-the-Fact Workgroup Update Sheryl Welch ISAS Meeting 01/28/2015 Salt Lake City, UT."

Similar presentations


Ads by Google