Presentation is loading. Please wait.

Presentation is loading. Please wait.

Gdańsk Container Terminal Co Established in 1998.

Similar presentations


Presentation on theme: "Gdańsk Container Terminal Co Established in 1998."— Presentation transcript:

1 Gdańsk Container Terminal Co Established in 1998

2

3 Our motto GTK is…

4

5 Major advantages: customer’s approach, professional and comprehensive services including terminal, depot and repair services. high quality standards. good connections to hinterland excellent transit connection to Russia, Belarus, Ukraine, Slovakia and Czech Republic

6

7 Location : Port of Gdańsk

8

9 Szczecińskie Quay

10

11 Technical facilities: quay length 367 m ship length up to 205 m max. draft 9.8 m open stores 67 417 m 2 reefer plugs – 95 units ships operated in lo-lo systems full support for railway wagons.

12

13 Technical facilities: Ship-to-shore gantry crane- 40 / 60 t Shore cranes- 40 t Gantry cranes- 32 / 40 t Straddle carrier- 40 t Reach-stackers- 10 t Mobile harbor crane- 100 t 95 stations for refrigerated containers

14

15 Range of services: loading / unloading, all kind of container handling services, stuffing, stripping, sampling, tallying, shifting ect. depot services (storage, repairs, washing, cleaning), goods storage on the yard, goods storage in the warehouse, consulting services assistance in contacts with administration Autorities and institutions (Custom Office, Sanitary Office, Veterinary Border Inspection)

16 Bulk cargo Project cargo General cargo We are specializing in stuffing and stripping of containers:

17 Bulk cargo:

18 Project cargo:

19 General cargo:

20

21 GTK Co. Strengths: strong bussines relations with our customers, experienced personnel with deep knowledge of the market and the core of business, wide range of services (container terminal, containers’ repairs, container depot, containers’ stuffing & stripping services), friendly IT software - SOTeK, possibility of an automatic access and transfer the system data based on EDIFACT standard, good location with increasing potential with road access to the terminal premises after completion the tunnel building under port cannal. 0

22

23 Railway Companies providing services to GTK Co.: PKP Cargo Cargosped Spedcont Prokont Baltic Rail

24

25 PORT OF GDAŃSK CONTAINER FEEDER SERVICES UNIFEEDER (calling once a week): Gdynia- Gdańsk (GTK)- Rotterdam Gdynia- Gdańsk (GTK)- Szczecin - Bremerhaven- Hamburg (calling twice a week) CMA - CGM (calling once a week): Hamburg- Gdańsk (GTK)- Kaliningrad - Tallin- Hamburg ROTTERDAM BREMERHAVEN HAMBURG Tallin Kaliningrad Szczecin

26

27

28 Major shipping lines handled at GTK: Hanjin Evergreen Hapag Lloyd CMA-CGM Cosco UASC Hamburg S Ü d ZIM CSAV China Shipping Yang Ming NYK Line K-Line NORASIA ANL Hyundai OOCL DELMAS Delphis Libra Eucon

29

30 Business Activity: Ship handling: 24 hours a day, 7 days a week, Handling of the container inland transport: from 7.00 a.m. on Monday until 3.00 p.m. on Saturday.

31

32 Contact: Gdańsk Container Terminal Co. Headquarter: Na Zaspę 3, 80-546 Gdańsk, Poland Port Office:– ul. M. Chodackiego; Szczecińskie Quay NIP: 583-25-55-159 KRS: 0000108214; Register Court in Gdańsk Initial capital: PLN 500.140,00 Tel.: +(48) 58 737 72 69 +(48) 58 737 72 74 +(48) 58 737 70 60 Fax: +(48) 58 737 72 75 E-mail: gtk@portgdansk.pl www.gtk-sa.pl Office working hours: 8.00 a.m. to 4.00 p.m. from Monday to Friday


Download ppt "Gdańsk Container Terminal Co Established in 1998."

Similar presentations


Ads by Google