Presentation is loading. Please wait.

Presentation is loading. Please wait.

Initial Engine Company Operations. – Command Post location Move away from the pump panel once command is transferred from the Engineer to an Officer –

Similar presentations


Presentation on theme: "Initial Engine Company Operations. – Command Post location Move away from the pump panel once command is transferred from the Engineer to an Officer –"— Presentation transcript:

1 Initial Engine Company Operations

2 – Command Post location Move away from the pump panel once command is transferred from the Engineer to an Officer – Don’t swarm the Incident Commander Accountability Training Lessons Learned

3 Reminders Command Aide – Monitors the main radio frequency (Green) Incident Commander – Monitors the tactical radio frequency (Gold) Command Transfer Questions

4 Discussion Points Primary Size-up 1.Arrival on scene 2.Description of the structure/vehicle 3.Description of the problem 4.Establish Command 5.Assign a tactical channel – “E101 is on the scene of a small single story residential structure with heavy black smoke showing from side 1. E101 is assuming Shiloh Command, all units check in on Gold upon arrival.”

5 Secondary Size-up 1.“Columbia, 360 complete...” 2.Confirm findings from Primary Size-Up 3.Announce the Command Post location. 4.Declare the Incident Strategy a)Offensive or Defensive

6 Considerations during Secondary Size-up 1.Are occupants accounted for? 2.Is there a basement? (points of access) 3.Resource Determination/Allocation a)Water supply strategy b)Additional resources needed 4.Utilities 5.Exposures

7 Radio Traffic 5 step radio process Status Checks Conducting Personnel Accountability Reports CAN Reports – Conditions – Actions – Needs

8 Game Plan Size-up Scenarios – Work with you crews and fill out the worksheet for each scenario Operations – Safety Rehab – Dispatch – Accountability – Tactical Evolutions Water Supply


Download ppt "Initial Engine Company Operations. – Command Post location Move away from the pump panel once command is transferred from the Engineer to an Officer –"

Similar presentations


Ads by Google