Presentation is loading. Please wait.

Presentation is loading. Please wait.

Facilities Management. x = $ $  Backlog maintenance is consuming our estates.

Similar presentations


Presentation on theme: "Facilities Management. x = $ $  Backlog maintenance is consuming our estates."— Presentation transcript:

1 Facilities Management

2

3

4

5 x = $ $ 

6 Backlog maintenance is consuming our estates

7 2007 Go8 Survey ARV $12.7 billion Backlog $1.49 billion 53% assets rated poor to critical

8 The appeal of “new” over existing

9 Accurate condition reporting of building and infrastructure assets

10 The Next Survey Types of spaces ARV of these spaces Refurbishment history of these spaces Functionality of buildings Value of deferred capital works Environmental performance ratings

11

12 Green Performance Operational Inspirational

13 Requirement to register NGER Carbon Pollution Reduction Scheme Neutral Carbon Offset Standard Commonwealth Climate Change Initiatives

14 Current Custodians


Download ppt "Facilities Management. x = $ $  Backlog maintenance is consuming our estates."

Similar presentations


Ads by Google