Download presentation
Presentation is loading. Please wait.
Published byTiana Duncombe Modified over 9 years ago
1
A few notes about Workload Management in LCG2 and beyond (for EB people… )
2
Workload management in LCG2 -Conceptual the same as in edg -User interface the same as in edg edg-job-submit –vo cms myjob.jdl Etc -Made more robust Using modified bdii etc Still not perfectly robust (by some way) but is much better -Seem to scale to current size of LCG (>40 sites, 3100 cpus etc) -Making it more robust has made it slower so submitting a large number of jobs can take a very long time!
3
Beyond LCG2 -Will be based on ARDA Very different architecture to LCG2 Based on WS -However, functionality will not be very different to what is already there. -(Hopefully) robust and scalable UK involvement -Scalability and performance testing -Activity centred at Imperial College (HEP and LeSC)
4
Any questions… mail d.colling@imperial.ac.uk
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.