Presentation is loading. Please wait.

Presentation is loading. Please wait.

Area Operating Agreement Repackage (AOA) August 21, 2005.

Similar presentations


Presentation on theme: "Area Operating Agreement Repackage (AOA) August 21, 2005."— Presentation transcript:

1 Area Operating Agreement Repackage (AOA) August 21, 2005

2 Approvals Planning Construction Operations Abandonment Decommission Reclamation

3 Outcomes Stewardship over entire life cycle of a disposition Processes and outcomes characterized by: –Comprehensiveness, –certainty, –predictability, and –timeliness Greater integration and common use Continual improvement

4 Industry Issues with AOA Consistency Approval time for AOA Continual requests for more detail prior to AOA approval Better definition of what is a “project” Confusion about what is meant by “Best Operating Practices”

5 Industry Issues (Cont) When to file application? Want electronic application processing Relationship of AOA to EFR Would like other approvals included in AOA process as well, eg. EPEA

6 AOA Process Repackage AOA More industry accountability for planning More industry accountability for integration with other users More industry accountability for monitoring and self-reporting Includes Part A, Part B, and Part C

7 AOA Part A Standard across province Reference to Public Lands Handbook Best operating practices Addresses all stages of the life cycle of a disposition Identifies company monitoring and reporting Address and identify process and timelines for sites approved but not entered

8 AOA Part A (Cont) Reporting required a.Electronic format b.Additional clearings c.Abandoned/reclaimed d.As builts e.Reporting on all dispositions including abandonment and reclamation

9 AOA Part A (Cont) Due diligence Compliance Plan Core conditions Forest Protection – Fire Smart plans Range management –PGR, Grazing Lease, etc.

10 AOA Part B Area or region specific Identifies how the company will be planning and operating to address specific issues. Examples are species at risk in the area, high risk erosion sites, major water crossings, perma frost, timber salvage, prairie vegetation maintenance.

11 AOA Part B (Cont) Integration with other land users –Agreement reached among major users –Joint planning –Result in Consents not an issue Examples of consents needed FMA Holders, Timber licensees Grazing Lessees

12 AOA Part B (Cont) Consultation SRD/Company communications Forest protection/grazing Notification to other users e.g. trappers How approval for specific sites will proceed

13 AOA Part C Disposition development Preliminary plan and map Final plan Specific site approval Low risk vs high risk

14 Site Development Reporting Monitoring As builts

15 AOA Training for general management of disposition including construction, drilling waste proposed to be handled by third party e.g. PITS

16

17

18

19 Quality Assurance Assessments of activities will be done during all stages of the life cycle Monitoring or compliance checks Enable focusing on high risk sites Address problem companies Provide measures or more verification on stewardship

20 Approvals Planning Construction Operations Abandonment Decommission Reclamation

21 Where to from Here AOA –Finalization of repackage of AOA –Consultation with industry – Aug 31 –Identification of companies for pilot – Aug 31 –Draft on website – Sep 15 –Industry information sessions – Oct 1 Quality Assurance –Compliance process – Dec 31


Download ppt "Area Operating Agreement Repackage (AOA) August 21, 2005."

Similar presentations


Ads by Google