Presentation is loading. Please wait.

Presentation is loading. Please wait.

My, my, How the Campus Has Grown!

Similar presentations


Presentation on theme: "My, my, How the Campus Has Grown!"— Presentation transcript:

1 My, my, How the Campus Has Grown!

2 UNR 1905 Major events: The Quad was made 13 buildings were added
A football field was added The President’s house was built

3 UNR 1915 Major events: Manzanita Lake was made 2 buildings were added

4 UNR 1925

5 UNR 1935

6 UNR 1945

7 UNR 1955

8 UNR 1955 Major events: UNR started looking north
N UNR 1955 Feet Major events: UNR started looking north A new map is required, With Virginia Street on the west, McCarran on the north, Ninth Street on the south, and Evans Street on the east Buildings are in black

9 UNR 1965

10 UNR 1975 Major events: The football stadium was
moved to its present place Hilliard Plaza buildings were built on the old stadium grounds Lawlor was built The planetarium was built 2 buildings were built across Virginia Street

11 UNR 1985

12 UNR 1995 Major events: A new baseball field was built

13 UNR 2005

14 UNR 2015 Major events: Getchell Library was torn down and replaced by
Pennington The Joe and the MIKC (new library) were built Hixson Softball Field and the track were built on the old Bishop Manogue site

15 UNR 2025 Major events: UNR will build south of
Ninth Street and on Evans Ave. White Pine Dorm was torn down and was replaced by Great Basin Dorm Wiegand Fitness Center was built ??


Download ppt "My, my, How the Campus Has Grown!"

Similar presentations


Ads by Google