Presentation is loading. Please wait.

Presentation is loading. Please wait.

Execute Purchase Order South Shore Water Reclamation Facility Grit Basins #1, #2, #3, and #7 Repairs Commission Agenda Item #6.

Similar presentations


Presentation on theme: "Execute Purchase Order South Shore Water Reclamation Facility Grit Basins #1, #2, #3, and #7 Repairs Commission Agenda Item #6."— Presentation transcript:

1 Execute Purchase Order South Shore Water Reclamation Facility Grit Basins #1, #2, #3, and #7 Repairs Commission Agenda Item #6

2 SSWRF Grit Basins Grit removal Final step in preliminary treatment
Remove grit, sand and abrasive inorganics Prevents equipment damage in primary clarification

3 SSWRF Grit Basins Seven basins Rectangular, concrete tanks
Six required to maintain plant capacity (300 MGD) Chain and flight collection system Collects grit from bottom of the basin Flights are glass reinforced polyester Chain and drive are nylon or other plastics Severely worn and inefficient

4 Grit Basins

5 SSWRF Grit Basins Covered Grit Basins

6 Worn and Damaged Chain and Flight
Worn sprockets Worn and Damaged Chain and Flight

7 Contract Scope Remove and dispose of the existing chain and flight components in Grit Basins #1, #2, #3, #7 Furnish and install 49 new glass reinforced polyester flights Furnish and install new chain and drive components Includes sprockets and shafts

8

9 Project Bid VWM competitively bid the work
Doral Corporation was lowest bidder, 2 bids received Within budget VWM will manage and oversee the work 365 day duration

10 QUESTIONS? No need in this case to re-state the request.


Download ppt "Execute Purchase Order South Shore Water Reclamation Facility Grit Basins #1, #2, #3, and #7 Repairs Commission Agenda Item #6."

Similar presentations


Ads by Google