Download presentation
Presentation is loading. Please wait.
1
Helsingborg
3
Abstract, previous studies
1 Abstract, previous studies 2 Actions: Beach improvements Protection from rising sea levels (railway station/city centre and the village Råå) Urban development in the harbour Flood problems along stream The port form their areas according to rising sea levels Heavy rain and low-points. Protection from rising sea levels - surface water. Climate change action plan. 6 (hela staden) 3 5 5 4 1 2 1
4
What we’re actually doing?
North tunnel portal, small levee Central station, preparing portable protection New development on a higher level
5
Long term strategy Inner protection Outer protection
Reference: No actions
7
New conditions in the future
Existing conditions New conditions in the future + West coast railway Tunnel portal at +2,4 Emergency exit from tunnel +1,9 Stairs etc around Helsingborg C +2,4 + City Central Quay at +1,9 Bridges at +2,5 New blocks at +3,5 + Expansion of the West coast railway Construction + Fixed linked to Denmark Possible in the future
8
Time schedule Study Procurement phase Start-up meeting Risk Analysis
Final report Technical study Aug Sep Oct Nov Dec Jan Feb Mar Apr May 2019
9
Study Point out one strategy
Propose actions for investment planning (~10 years) Propose long term actions for master planning Basis for railway/urban planning Risk evaluation Technical studies Report, late spring 2019
10
Upcoming activity Projectgroup will plan for visiting Gothenburg and Uddevalla. Planning for a exchange with Dordrecht through Barry Gersonius. Short term actions for Helsingborg C. Investigate where to install flood protection. Investigate mobile floodbarriers like FloodGate and/or sandbags. Create rutins for imminent flood threat to Helsingborg C.
11
Challenges Involve national and local organisations for floodprotection. Political ambitions versus long term function
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.